Browse
Search
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-391-E-AMS-Racanelli Construction South-1091 Pemberton Hill rd suite 102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 11:13:47 AM
Creation date
8/23/2022 11:10:29 AM
Metadata
Fields
Template:
Contract
Date
8/15/2022
Contract Starting Date
8/15/2022
Contract Ending Date
8/22/2022
Contract Document Type
Contract
Amount
$5,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12, 2020 <br />308 WEST FRANKLIN, CHAPEL HILL, NC <br /> <br />WOOD DOORS 081416 - 5 <br />1. Fabricate door and transom panels with full-width, solid-lumber[, rabbeted,] meeting <br />rails. Provide factory-installed spring bolts for concealed attachment into jambs of metal <br />door frames. <br />D. Openings: Cut and trim openings through doors in factory. <br />1. Light Openings: Trim openings with moldings of material and profile indicated. <br />2. Glazing: Factory install tempered frosted glazing in door indicated as glazed. <br />3. Louvers: Factory install louvers in prepared openings. <br />2.5 FACTORY FINISHING <br />A. General: Comply with referenced quality standard for factory finishing. Complete fabrication, <br />including fitting doors for openings and machining for hardware that is not surface applied, <br />before finishing. <br />1. Finish faces, all four edges, edges of cutouts, and mortises. Stains and fillers may be <br />omitted on edges of cutouts, and mortises. <br />B. Finish doors at factory. <br />C. Finish doors at factory that are indicated to receive transparent finish. Field finish doors <br />indicated to receive opaque finish. <br />D. Finish doors at factory where indicated in schedules or on Drawings as factory finished. <br />E. Transparent Finish: <br />1. Grade: Custom. <br />2. Finish: catalyzed polyurethane system. <br />3. Finish: TR-6 catalyzed polyurethane. <br />4. Staining: As selected by Architect from manufacturer's full range. <br />5. Effect: Open-grain finish. <br />6. Sheen: Satin. <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Examine doors and installed door frames before hanging doors. <br />1. Verify that frames comply with indicated requirements for type, size, location, and swing <br />characteristics and have been installed with level heads and plumb jambs. <br />2. Reject doors with defects. <br />B. Proceed with installation only after unsatisfactory conditions have been corrected. <br />DocuSign Envelope ID: 775B89AF-3514-4D9E-B148-2FDE4EFF16C2
The URL can be used to link to this page
Your browser does not support the video tag.