Browse
Search
8.17.22 OUTBoard Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2022
>
8.17.22 OUTBoard Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 10:37:37 AM
Creation date
8/23/2022 10:36:46 AM
Metadata
Fields
Template:
BOCC
Date
8/17/2022
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TIP/WBS # Description LET/Start <br />Date <br />Completion <br />Date Cost Status Project Lead <br />SS-6007AD <br />49823.1.1 <br />49823.3.1 <br />Convert intersection from two way stop to all way stop at the <br />intersection of SR 1710 (Old NC 10) and SR 1712 (University <br />Station Road) west of Durham <br />5/31/2022 Sep. 2022 $28,000 Planning and design activities underway. <br />Scheduled for installation on 5/11/22, <br />pending weather. <br />Dawn McPherson <br />SS-4907CD <br />47936.1.1 <br />47936.2.1 <br />47936.3.1 <br />Horizontal curve improvements on SR 1710 (Old NC 10) <br />west of SR 1561/SR 1709 (Lawrence Road) east of <br />Hillsborough. Improvements consist of wedging pavement <br />and grading shoulders. <br />6/1/2022 Nov. 2022 $261,000 Planning and Design activities currently on <br />hold - Project shelved due to minimal <br />crash rate during observation period. To <br />be resubmitted for federal funding. <br />Chad Reimakoski <br />P-5701 <br />46395.1.1 <br />46395.3.1 <br />Construct Platform, Passenger Rail Station Building at <br />Milepost 41.7 Norfolk Southern H-line in Hillsborough <br />6/30/2023 <br />6/30/2022 <br />FY2025 <br />FY2024 <br />$7,200,000 PE funding scheduled 7/1/2020 Matthew Simmons <br />SS-6207A <br />50337 <br />NC 54 Pedestrian improvements between SR 1902 (Manning <br />Drive) and SR 1937 (Old Fayetteville Road) in Chapel Hill <br />and Carrboro. Improvements will include refuge islands, <br />crosswalks and pedestrian signals. Improvements to be <br />completed by state forces. <br />10/31/2022 6/30/2023 $171,000 Planning and design activities underway.Dawn McPherson <br />BL-0044 <br />49998.1.1 <br />NC 54 from Westbrook Drive in Carrboro to west of US <br />15/501/NC 86 (South Columbia Street) interchange in Chapel <br />Hill. Construct sidewalk and install pedestrian signals, <br />crosswalks, and refuge islands at selected locations. <br />2/16/2023 2/28/2024 $1,311,000 Planning and design activities underway.Chad Reimakoski <br />I-5958 <br />45910.1.1 <br />45910.3.1 <br />Pavement Rehabilitation on I-40/I-85 from West of SR 1114 <br />(Buckhorn Road) to West of SR 1006 (Orange Grove Road) <br />11/17/2026 FY2028 $8,690,000 PE funding approved 10/10/17 Chad Reimakoski <br />I-5967 <br />45917.1.1 <br />45917.2.1 <br />45917.3.1 <br />Interchange improvements at I-85 and SR 1009 (South <br />Churton Street) in Hillsborough <br />10/19/2027 FY2030 $16,900,000 PE funding approved 9/8/17, Planning and <br />Design activities underway, Coordinate <br />with I-0305 and U-5845 <br />Laura Sutton <br />NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT <br />Page 1 <br />DCHCMPO Jul. 2022 <br />89
The URL can be used to link to this page
Your browser does not support the video tag.