Orange County NC Website
TIP/WBS # Description Let/Start <br />Date <br />Completion <br />Date Cost Status Project Lead <br />NCDOT PROJECTS LOCATED IN BGUMPO - UNDER DEVELOPMENT <br />W-5707D <br />44853.1.4 <br />44853.2.4 <br />44853.3.4 <br />Safety Improvements to curve on NC 49 located between <br />Buckingham Mountain Road and SR 2363 (Beale Road) in <br />Snow Camp <br />6/16/22 Nov. 2022 $450,000 Planning and design activities <br />underway; ROW acquisition <br />underway <br />Chad Reimakoski <br />U-6017 <br />47162.1.1 <br />47162.2.1 <br />47162.3.1 <br />Intersection improvements at NC 54 (East Harden St.) and <br />NC 49 (East Elm St.) in Graham <br />6/15/23 FY2025 $2,100,000 Planning and design activities <br />underway - ROW underway <br />Rob Weisz <br />U-6013 <br />47158.1.4 <br />47158.2.4 <br />47158.3.4 <br />Widen NC 119 to multi-lanes from SR 1981 (Trollingwood- <br />Hawfields Rd)/ SR 2126 (Old Hillsborough Rd) to Lowes Blvd <br />(non-system) in Mebane. <br />12/19/23 FY2026 $6,200,000 Planning and design activities <br />underway, ROW beginning <br />underway <br />Rob Weisz <br />U-6011 <br />47146.1.1 <br />47146.2.1 <br />47146.3.1 <br />Intersection improvements at US 70 (South Church Street) <br />and SR 1158 (Huffman Mill Rd) in Burlington <br />8/20/24 FY2026 $2,400,000 Planning and design activities <br />underway - ROW acquisition <br />pending <br />Brian Ketner <br />U-5844 <br />50234.1.1 <br />50234.2.1 <br />50234.3.1 <br />Construct multi-lanes on NC62 from SR 1430 (Ramada Road) <br />to US 70 (South Church Street) in Burlington <br />3/18/25 FY2028 $10,000,000 Planning and design activities <br />underway <br />Rob Weisz <br />U-6014 <br />47159.1.1 <br />47159.2.1 <br />47159.3.1 <br />Widen SR 1716 (Graham-Hopedale Rd) to multi-lanes with <br />Bicycle/Pedestrian accommodations from SR 1720 (West <br />Hanover Rd) to Morningside Drive in Burlington <br />3/18/25 FY2027 $13,200,000 Planning and design activities <br />underway, Includes EB-5882 <br />Rob Weisz <br />B-6052 <br />48709.1.1 <br />48709.2.1 <br />48709.3.1 <br />Replace bridge 68 over NCRR / Norfolk Southern Railroad on <br />SR 1928 (Trollingwood Road) in Haw River <br />1/20/26 FY2027 $2,500,000 PE funding approved 5/6/19 Kevin Fischer <br />I-6009 <br />47962.1.1 <br />47962.2.1 <br />47962.3.1 <br />Interchange improvements at I-40/I-85 and SR 1158 (Huffman <br />Mill Road). Construct additional right turn lane on I-40 WB <br />Ramp and improve operations at SR 1308 (Garden Road) <br />intersection in Burlington <br />6/27/29 FY2031 $936,000 PE funding approved 6/5/18 Brian Ketner <br />Page 2 <br />BGUMPO May 2022 <br />86