Orange County NC Website
TIP/WBS # Description Let/Start <br />Date <br />Completion <br />Date Cost Status Project Lead <br />SS-4907BQ <br />44757.1.1 <br />44757.2.1 <br />44757.3.1 <br />Intersection improvements (All Way Stop) at SR 1005 <br />(Greensboro-Chapel Hill Road) at SR 2369 (Sylvan <br />School Road) and SR 2371 (Pleasant Hill Road) in Snow <br />Camp. <br />5/1/21 Jun. 2021 $22,500 R/W <br />$153,000 CON <br />4-way stop installation and flasher <br />completed 4/17/18, utility relocations <br />complete, widening to be completed <br />under resurfacing project in summer <br />2022 <br />Derek Dixon <br />48798 Installation of crosswalks and pedestrian signals and update <br />curb ramps at the intersection of US 70 (South Church Street) <br />and Edgewood Avenue (non-system) in Burlington. <br />8/4/21 Jul. 2022 $150,394 Construction Underway - Signal <br />upgrade completed, signal loops <br />and pavement markings remain to <br />be completed <br />Dawn McPherson <br />Derek Dixon <br />W-5807B <br />48952.1.3 <br />48952.2.3 <br />48952.3.3 <br />Installation of ADA curb ramps and pedestrian accessible <br />signals on SR 1301 (Boone Station Drive) at SR 1301 (St. <br />Marks Church Road) and Boone Station Drive (non-system) <br />at Glidewell Road/Tiki Lane (non-system) in Burlington <br />Oct. 2021 FY2022 $75,000 PE funds scheduled to be released <br />2/2/21 - Construction Underway - All <br />work completed aside from APS at <br />Boone Station Drive <br />Dawn McPherson <br />Chad Reimakoski <br />B-5728 <br />45684.1.1 <br />45684.2.1 <br />45684.3.1 <br />Replace Bridge #112 over Reedy Fork Creek on NC87 in <br />Ossipee <br />4/19/22 FY2025 $6,200,000 Planning and design activities <br />complete - Contract execution in <br />process <br />Kevin Fischer <br />U-6010 <br />47145.1.1 <br />47145.2.1 <br />47145.3.1 <br />Intersection improvements at US 70 (South Church Street) <br />and SR 1226/SR 1311 (University Drive) in Burlington <br />4/19/22 FY 2024 $8,400,000 Planning and design activities <br />underway, ROW acquisition <br />complete, Utility relocations <br />underway - Contract execution in <br />process <br />Brian Ketner <br />47786 <br />SM-5707B <br />47903.2.1 <br />Intersection improvements on SR 1007 (Mebane Oaks Rd) at <br />SR 2126/2128 (Old Hillsborough Rd) south of Mebane. <br />Improvements include addition of left and right turn lanes, <br />radii widening, signal installation, resurfacing, and pavement <br />markings. <br />7/1/2022 <br />4/27/2022 <br />Aug. 2022 $898,500 Design complete, ROW complete Chad Reimakoski <br />Derek Dixon <br />SS-6007AE <br />49822.1.1 <br />49822.3.1 <br />Convert intersection from two way stop to all way stop at SR <br />1005 (E. Greensboro Chapel Hill Road) at SR 2351 (Bethel <br />South Fork Road) in Snow Camp. <br />3/9/2022 <br />Jun. 2022 <br />FY2023 $30,000 Planning and design activities <br />underway - installation of all way <br />stop installed 3/9/2022, Pending <br />final inspection <br />Dawn McPherson <br />NCDOT PROJECTS LOCATED IN BGUMPO - UNDER DEVELOPMENT <br />Page 1 <br />BGUMPO May 2022 <br />85