Orange County NC Website
Page 6 of 9 <br /> <br />units from entering into certain contracts “unless the contractor and the contractor’s <br />subcontractors comply with the requirements of Article 2 of Chapter 65 of the General <br />Statues.” (Article 2 of Chapter 65 establishes North Carolina’s E-Verify requirements for <br />private employers.) It is important to note that the verification requirement applies to <br />subcontractors as well as contractors. The new laws specifically prohibit governmental units <br />from entering into contracts with contractors who have not (or their subcontractors have not) <br />complied with E-Verify. <br /> <br /> <br />IV. Scope of Work: <br /> <br />This project consists of providing and installing a single private sewer service lateral in <br />accordance with OWASA specifications and all applicable Town building and plumbing <br />codes. The work also includes a mandatory preliminary site investigation (to be conducted <br />prior to submittal of your bid) and post-construction site restoration to pre-construction <br />conditions (e.g. restoration of gravel or pavement sidewalks/driveways (if needed), re- <br />grading, raking, seeding/re-sodding, etc.). Based on available record drawings, the existing <br />sewer service stub-outs to which the private sewer service laterals will be connected range <br />from approximately 4-ft deep to approximately 16-ft deep. <br /> <br />Sewer Service Lateral Connections: <br /> <br />• Provider shall apply for and secure all applicable plumbing and/or code-specific <br />permits from the Town of Chapel Hill or the Town of Carrboro Permits and Inspections <br />Divisions, depending on the jurisdictional area in which the work is being performed, <br />prior to starting work. <br />• Provider shall provide any traffic control or other safety measures according to the <br />most current NCDOT, OSHA or other safety requirements related to the work being <br />performed. <br />• Excavate to existing ductile iron mechanical joint plug located at existing sewer <br />service stub-out near property line. <br />• Install 4-inch sewer service lateral with all fittings and appurtenances (Schedule 40 <br />PVC pipe or ductile iron pipe, depending on site conditions) to connect existing <br />dwelling’s wastewater discharge system to existing sewer service stub-out near <br />property line. <br />• Cap existing wastewater line to septic tank. <br />• Provider shall coordinate final inspections and secure final certifications from the <br />Town of Chapel Hill or the Town of Carrboro Permits and Inspections Divisions, <br />depending on the jurisdictional area in which the work is being performed. <br />• Restore site to pre-construction conditions, seed and straw all disturbed areas when <br />done. <br />• Upon completion of both the Sewer Lateral Connection and the Septic Tank <br />Abandonment (see below), Provider shall coordinate with the Orange County Staff <br />Engineer to schedule a final walk-through and certification of the completed work prior <br />to Orange County’s issuance of final payment to the Provider. <br /> <br />DocuSign Envelope ID: A3CE6C07-13D8-4FB5-AC5E-288930FD9CA8