Browse
Search
Agenda - 03-25-2002 - 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 03-25-2002
>
Agenda - 03-25-2002 - 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 8:17:48 AM
Creation date
8/29/2008 10:37:26 AM
Metadata
Fields
Template:
BOCC
Date
3/25/2002
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes - 20020325
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Approved 11/21/00 <br /> ORANGE COUNTY <br /> Policy on Planning and Funding Scliool Capital Projects <br /> (This document is intended to clarify the expectations of the Orange County Board of Commissioners in <br /> collaborating with the Boards of Education in planning for and implementing school capital projects) <br /> 1. Background <br /> The County's ten year capital investment plan is a planning document that is updated annually. <br /> Before the beginning of each fiscal year, the Board of County Commissioners approves the <br /> funding plan in concept. However, funding of individual projects is contingent upon the scope <br /> of work required to complete the project. <br /> • Level 1 Projects: Level one projects are those projects that have a relatively small scope <br /> of work and can be accomplished using a single prime contractor,in-house staff or entail <br /> purchasing equipment and vehicles. Specific examples of Level 1 projects include <br /> roofing projects,parking lot paving and re-wiring of existing buildings. The Board <br /> approves the entire project ordinance at one time. <br /> • Level 2 Projects: Level two projects are major projects that require several phases to <br /> complete. For these projects, the Board of County Commissioners approves a four-phase <br /> appropriation process to include: <br /> • Concept/Pre-Planning Phase (includes preliminary programming and design work <br /> that would result in conceptual drawings and preliminary cost estimates. <br /> • Planning Phase(including siting&infrastructure) <br /> • Design and Construction Approval Phase (including final design,equipment, <br /> furnishings, non-recurring start up,technology,contingency) <br /> • Schools have the latitude to shift funds between major components without <br /> prior BOCC approval,providing that the actual cost of the project does not <br /> exceed budget. <br /> • Superintendents will provide the County Manager with written project <br /> updates at their regular monthly meetings. In turn,the County Manager will <br /> provide the Board of County Commissioners with written progress reports <br /> related to the project. <br /> • Final Accounting Phase <br /> ■ Upon completion of the project, School and County staff will reconcile actual <br /> project expenditures with approved budget and provide the BOCC with a <br /> "final accounting"of project. <br /> Page 1 of 6 <br /> Policy on Planning and Funding School Capital Projects <br />
The URL can be used to link to this page
Your browser does not support the video tag.