Orange County NC Website
MMOSELEY <br /> � � � HARRIS&":11ti MCCLINTOCK <br /> ® W4VYl.Ir1Ht4:�°:CHITECTS.COM <br /> Ray Road's intersection with Smith Level Road would need to be improved to a three lane <br /> section with separate right and left turn lanes onto Smith Level Road. <br /> -- Rock Haven Road to the east Is a private road in a high-density residential development. Since <br /> It is not designed for heavy traffic volumes and is within a residential community, use of it as an <br /> access road to the school is strongly discouraged. <br /> Utility Infrastructure: An existing 12"waterline exists along Smith Level Road. An 8"public water <br /> lirie would need to be tapped from that line and extended 1,200 L f. along Ray Road from the <br /> east: Additionally, the waterline would be required to loop approximately 1,600 1.f. through the <br /> school site to connect to the 8"Rock Haven Road water line. <br /> Three possible routes for sanitary sewer exist: <br /> Option One Is an 8"gravity sewer line 1,000 L f. off site on Smith Level Road that would require <br /> easements from property owners to the east of the school site to provide access. <br /> Option Two Is on Rock Haven Road that is served by on 8"sanitary sewer line 1,100!,f. from the <br /> proposed school building location and appears to be capable of gravity flow. A 3001.f. utility <br /> easement from the apartment complex may be required. <br /> Option Three is a 1,200 Lf extension to the north to fle Into Highland Hills Apartments. A 200 1.f. <br /> utility easement from the apartment complex may be required. <br /> One hundred percent of the cost of extending utility lines would be the responsibillty of the <br /> school system on all three sites. <br /> Approximate <br /> Buildable Area: Total Acreage 39.75 <br /> Acreage in Perimeter, Stream Buffers 4.00 <br /> Acreage in 20%or greater slopes 5.80 <br /> Net Buildable Area: Approximately 30 acres <br /> Approximate linear feet of public road improvements 1,100 Lf. <br /> Estimated opinion of cost of road improvements in 2002 dollars ($95,000-$110,000) <br /> Approximate linear feet of public water line improvements 2,800 I.f. <br /> Estimated opinion of cost of water line improvements in 2002 dollars ($100,000-$125,000) <br /> Approximate linear feet of public sewer line improvements 1,100 Lf. <br /> Estimated opinion of cost of sewer line improvements in 2002 dollars ($50,000-$60,000) <br /> Total opinion of public infrastructure costs: Range of approximately$245,000-$295,000 <br /> Chapel Hill-Carrboro City Schools High School Site Selection Study <br />