Orange County NC Website
Article 5: Uses 93 <br /> Section 5.21: Standards for Miscellaneous Uses <br /> (vii) Use of xeriscaping principles. <br /> (e) Stormwater Management <br /> (i) A Stormwater Management Plan (SMP)135 shall be prepared and <br /> reviewed in accordance with the provisions of Section 6.14 of <br /> this Ordinance. <br /> (ii) All drainage structures will be installed and maintained according <br /> to the approved Stormwater Management SMP. <br /> (iii) Subdivisions that include Sstormwater Ceontrol Mmeasures <br /> (SCMs) shall comply with Section 6.14 of this Ordinance. <br /> (f) Grading and Erosion Control <br /> (i) Plans for grading and erosion control comply with standards <br /> contained in the Orange CGURty Er lion and coalmen+ G ntr i <br /> almost current version of the North Carolina Administrative <br /> Code Title 15A Chapter 4: Sedimentation Control, and the most <br /> current version of the North Carolina Erosion and Sediment <br /> Control Planning and Design Manual (NC Erosion Control <br /> Manual).m^c+GUFFeRt n,f the North Q;rAl4n;; Crl,r 4nn ;;nd <br /> spdoma t 12nntr„i Pl;;n,i., a.,rl nay,.n 136 n <br /> 8r�16e; <br /> (ii) Construction is phased to the extent practical to minimize <br /> disturbance and sedimentation; <br /> (iii) Sediment control measures will be properly installed to filter <br /> sediment from runoff during construction and maintained until <br /> grading is complete and a permanent vegetative cover has been <br /> established and all slopes stabilized; and <br /> (iv) Permanent landscaping, groundcover, mulch, etc. will be <br /> installed as soon as practical after construction activities for each <br /> phase are completed. <br /> (g) Solid Waste Management Plan <br /> A solid waste management plan, submitted as part of the Resources <br /> Management Plan, shall include the method(s)of disposal and recycling <br /> of construction debris. <br /> (h) Irrigation <br /> (i) Irrigation systems for the subdivision and the lots in the <br /> subdivision are designed and can be operated according to a <br /> water conservation plan described in the Resources <br /> Management Plan submitted with the application; <br /> (ii) The Resources Management Plan shall identify the source(s)of <br /> water to be used for irrigation, the volume available for that <br /> purpose, and expected consumption rates. The system design <br /> and plan for operation will be evaluated based on efficiency; and <br /> (iii) Water recycled from stormwater retention ponds or treated <br /> wastewater effluent may be used for irrigation where it is a <br /> legally permitted alternative. <br /> (i) Habitat Maintenance <br /> "'Consistent use of"Stormwater Management Plan (SMP)"—NOTE. "Stormwater Management Plan"and <br /> "SMP"is integrated through the remainder of Article 5, where applicable. <br /> "I Correct reference to the North Carolina manual. There is no Orange County manual. <br /> Orange County, North Carolina—Unified Development Ordinance Page 5-124 <br />