Orange County NC Website
Article 5: Uses 78 <br /> Section 5.7: Standards for Recreational Uses <br /> (v) A plan showing how the site will be protected from impacts by <br /> human and unwanted animal intrusion, alternate plant species <br /> and construction methods that could be used in the event <br /> adjustments or substitutions are needed until the mitigation area <br /> is established; and <br /> (vi) A financial guarantee is required for the total cos}of the mitigation <br /> project. Once the installurratioon_is complete, 30% of the amount of <br /> the hnn.J latter Of sca '} or escrow will be held fee 12 mr)n}hs G <br /> Gh <br /> until the s r! <br /> site i established, whiGheyer is sate Consistent with <br /> Section(s) 2.27 and 6.22 of this Ordinance, a Performance <br /> Guarantee shall be required for the mitigation project..117 <br /> (E) Construction <br /> (1) Drainage <br /> (a) All drainage structures shall be installed and maintained according to the <br /> approved Stormwater Management Plan. <br /> (b) Golf courses that include Sstormwater CBontrol Mmeasures (SCMs) shall <br /> comply with the requirements in Section 6.14 of this Ordinance. <br /> (2) Grading and Erosion Control <br /> (a) Plans for grading and erosion control must comply with standards <br /> contained in this Ordinance and the nraRge County cr.,si.,n aR <br /> Sediment Control Mangyalmost current version of North Carolina <br /> Administrative Code Title 15A Chapter 4: Sedimentation Control, and the <br /> most current version of the NC Erosion Control Manual;118 <br /> (b) Whenever practical, construction shall be phased to minimize <br /> disturbance and sedimentation; <br /> (c) Sediment control measures must be properly installed to filter sediment <br /> from runoff during construction and shall be maintained until grading is <br /> complete and a permanent vegetative cover has been established and <br /> all slopes stabilized; and <br /> (d) Permanent landscaping, groundcover, mulch, etc. must be installed as <br /> soon as practical after construction activities for each phase are <br /> completed. <br /> (3) Solid Waste Management <br /> (a) The Solid Waste Management Plan submitted as part of the Resources <br /> Management Plan shall include the method(s) of disposal and recycling <br /> of construction debris. <br /> (F) Operation and Maintenance <br /> (1) Integrated Pest Management (IPM) <br /> (a) An integrated pest management plan (IPM) shall be established based <br /> on site conditions, soils, pesticide properties and management practices. <br /> (b) The plan shall be updated as necessary to incorporate changes in <br /> pesticide choices, applications, etc. <br /> 11'Reference to new sections. <br /> Zis Correct reference to the most current versions of North Carolina Administrative Code Title 15A Chapter 4: <br /> Sedimentation Control and the most current version of the NC Erosion Control Manual. There is no Orange County <br /> manual. <br /> Orange County, North Carolina—Unified Development Ordinance Page 5-44 <br />