Orange County NC Website
57 <br /> Control Plan that is necessary to comply with the 58erosion and sedimentation <br /> provisions of this Ordinance. <br /> (B) After approving an Erosion Erosion and Sedimentation Control PlanControl Plan, if the <br /> Erosion Control Officer, either upon review of such Erosion and Sedimentation Control <br /> Plan I n or on inspection of the job site, determines that a significant risk of accelerated <br /> erosion or off-site sedimentation exists, the Erosion Control Officer shall require a revised <br /> Erosion and Sedimentation Control PlanP1an. <br /> (C) Pending the preparation and approval of a revised Erosion Erosion and Sedimentation <br /> Control Plan, work shall cease or shall continue under conditions outlined by the Erosion <br /> Control Officer. <br /> 2.19.8 Timeframe for Review of Revised Erosion and Sedimentation Control Plans59 <br /> Failure by the Erosion Control Officer to approve, approve with modifications, or disapprove a <br /> revised Erosion and Sedimentation Control Plan submittal within 15 calendar days of the date at <br /> which the revised Erosion and Sedimentation Control Plan submittal was determined bV the <br /> Erosion Control Officer to be complete shall be deemed an approval of the Erosion and <br /> Sedimentation Control Plan.Eail„re to approve, approve with ^r +;+,^^s, approve <br /> Plan within 15 days of receipt shall be deemed approval of the pIane.rA_1_;*A_1n -;;Ad- <br /> 60 <br /> 2.19.9 TiMe-fraMe f.,r Response to Review Comments61 <br /> (A) The applicant for the Erosion and Sedimentation Control Plan shall submit written <br /> responses to anV/62all written review comments from the Erosion Control Officer and shall <br /> submit a revised Erosion and Sedimentation Control Plan.+h^ pee& ^ ^.fires g-hM;++;n^ <br /> er wr assume that <br /> the o pliGatiGR fer pion erosion Rd sedoMeRtatm^n r Gruel pion a ,al has <br /> abandGRed <br /> (B) The Erosion Control Officer shall give warning in writing to the person or firm submitting <br /> the plan-Erosion and Sedimentation Control Plan before terminating the review of an <br /> Erosion and Sedimentation Control Plan . <br /> (C) In accordance with Section 2.2 of this Ordinance63 ErosionErosion and Sedimentation <br /> Control PlanControl-P-lan review fees are not refundable. <br /> 2.19.10 Erosion and Sedimentation Control Plan Amendments <br /> (A) Applications for amendments to-of an approved Erosion Erosion and Sedimentation <br /> Control Plan c^^+���,of ;lan in written and/or graphic form may be made at any time under <br /> the same conditions as the original application. <br /> (B) Until such time as said amendment is approved by the Erosion Control Officer, the land <br /> disturbing activi Land-Disturbing Activities shall not proceed except in accordance with <br /> the Erosion Erosion and Sedimentation Control PlanControl-Plan as originally approved. <br /> (C) The provisions of subsection 2.19.7 (B) and (C)of this Ordinance64 shall also apply to <br /> amended €resienErosion and Sedimentation Control Plans. <br /> 58 Deleted "soil". <br /> S9 Text correction-added "s". <br /> 60 This section was clarified/refined based on NCDEQ peer review comment. <br /> "Title of Section 2.19.9 was refined to better reflection section content. <br /> 62 Edit(s) based on Legal Sufficiency Review comments. <br /> es Reference to"this Ordinance". <br /> e4 Reference to"this Ordinance". <br /> Orange County, North Carolina—Unified Development Ordinance Page 3-lxvi <br />