Orange County NC Website
56 <br /> Plan submittal is not considered complete until the appropriate review fees have been <br /> paid in full.50 <br /> W(B) Once an Erosion and Sedimentation Control Plan has been determined to be complete <br /> by the Erosion Control Officer and the appropriate review fees have been paid in full, <br /> theThe Erosion Control Officer shall within 30 business days <br /> Of FeGelpt+hepeof will notify the Erosion and Sedimentation Control Plan that s <br /> deer4applicant in writing that the complete Erosion and Sedimentation Control Plan has <br /> been: <br /> (1) Approved, <br /> (2) Approved with modifications, or <br /> (3) Approved with eeeditions, <br /> (4) with perfermaR tiOR 51 <br /> Approved � ee�sewa�,�s <br /> (5)(3) Disapproved. <br /> ( ()Examples of approvals with modifications include^^^clitions of approval are, but are not <br /> limited to: <br /> (1) Channel stabilization must be successful or another type of lining must be used; <br /> (2) Delineating certain areas to be graded and stabilized within a specified number <br /> of days to reduce the potential for erosion and protect critical areas; <br /> (3) Providing a per#er.m._a.nr_,e serVurity to pmvide perpiqameRt gFeu;d-cover er <br /> (4)(3) Requiring the PeFSGR fir,aRG'ally FeSPG sib4eFinancially Responsible Party to <br /> retain the services of a professional engineer or architect to supervise <br /> implementation of the approved EFGSiGRrErosion and Sedimentation Control <br /> P I a nSentrel Rlae. <br /> (q(Q) Disapproval of an Erosion and Sedimentation Control Plan-plan must specifically state in <br /> writing the reasons for disapproval. <br /> 2.19.6 Timeframe for Review of New-"Erosion and Sedimentation Control Plans53 <br /> Failure by the Erosion Control Officer to approve, approve with ^^^,+;tier,^ approve with <br /> modifications,or disapprove an GGMp'^te neW54 Erosion and Sedimentation Control Plan <br /> submittal -within 30 calendar days of the date at which the 55Erosion and Sedimentation <br /> Control Plan submittal was determined by the Erosion Control Officer to be complete-receipt-6f <br /> shall be deemed aan approval of the <br /> Erosion and Sedimentation Control Plan.56 <br /> 2.19.7 Required Revisions <br /> (A) If, following commencement of a ' Land-Disturbing Activity pursuant <br /> to an approved ptanErosion and Sedimentation Control Plan, the Erosion Control Officer <br /> determines that the plaq-Erosion and Sedimentation Control Plan is inadequate to meet <br /> the requirements of the&9i 57erosion and sedimentation provisions of this Ordinance, the <br /> Erosion Control Officer may require any revision of the p4an-Erosion and Sedimentation <br /> so Added clarification here that a plan submittal is not considered complete until review fees are paid. <br /> si"Approved with conditions" and "Approved with performance reservations" have been eliminated based on <br /> most current NCAC changes(15A NCAC 0413.0118), revised based on NCDEQ peer review comment. <br /> sz Edit(s) based on Legal Sufficiency Review comments. <br /> ss Text correction—added "s". <br /> 14 Edit(s) based on Legal Sufficiency Review comments. <br /> ss Edit(s) based on Legal Sufficiency Review comments. <br /> se This section was clarified/refined based on NCDEQ peer review comment. <br /> 57 Deleted "soil". <br /> Orange County, North Carolina—Unified Development Ordinance Page 3-Ixv <br />