Browse
Search
8.3.22 Planning Board Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2022
>
8.3.22 Planning Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2022 12:32:18 PM
Creation date
8/1/2022 12:25:22 PM
Metadata
Fields
Template:
BOCC
Date
8/3/2022
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
8.3.22 Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
52 <br /> 2.18.2 Application Requirements <br /> (A) An application for a L and DisturbiR. Dorn,;+an LDP shall be filed with the Erosion Control <br /> Officer on forms provided by the Planning Department. <br /> (B) An Erosion and Sedimentation Control Plans26 must be approved prior to issuance of a <br /> Land Disturbing Permi+an LDP. <br /> 2.18.3 Exemptions <br /> AnN-9 permit LDP is not required for the following activities: <br /> (A) For the purpose of fighting fires. <br /> (B) For the stock piling of raw or processed sand, stone, or gravel in material processing <br /> plants and storage yards, provided that sediment control measures have been utilized to <br /> protect against off-site damage. <br /> (C) For disturbanGes Land-Disturbing Activities that do not exceed 20,000 square feet in <br /> surface area, or 10,000 square feet if within the University Lake, Cane Creek, or Upper <br /> Eno Watersheds. In determining the area, lands under one or diverse ownership being <br /> developed as a unit shall be aggregated. <br /> (q(D) For Land-Disturbing Activity exclusions as defined in Section 6.15.4 of this Ordinance.27 <br /> 2.18.4 Erosion and Sedimentation Control Plan Required <br /> An Erosion and Sedimentation Control Plan must be submitted to the Erosion Control Officer <br /> when the proposed Iand dirt ur"a^^ Land-Disturbing Activity is greater than 20,000 square feet, <br /> or greater than 10,000 square feet if within the University Lake, Cane Creek, or Upper Eno <br /> Watersheds. <br /> 2.18.5 Expiration of PermItsLDPs <br /> (A) Erosion and Sedimentation Control Plan <br /> The Erosion Control Officer may establish an expiration date for Erosion and <br /> Sedimentation Control Plans associated with an approved LDP28approved under this <br /> Ordinance. Erosion and Sedimentation Control Plans associated with an approved <br /> LDPAppFevafs shall expire three (3)years29'8 MGRths after the LDP approval dates <br /> unless the land d;^+ r";^^Land-Disturbinq Activity is started as defined in (C) below. <br /> (B) Land Disturbing Permits LDPs <br /> (1) An LDP Land Disturbing Dear,;+must be obtained before beginning the <br /> d;s+,��a,ba^ceLand-Disturbinq Activity and may be obtained at any time as long as <br /> the associated Erosion and Sedimentation Control Plan Appre,4al-approva130_is <br /> valid. <br /> 2e"Erosion Control Plan" replaced with "Erosion and Sedimentation Control Plan"as defined in 15A NCAC <br /> 02H.1002 (Definitions)—NOTE. "Erosion and Sedimentation Control Plan"is integrated through the remainder of <br /> Section 2.18, where applicable. <br /> 2'Added critical reference to full list of exempt land-disturbing activities. <br /> 28 The"LDP" is the actual permit;therefore the associated approved Erosion and Sedimentation Control Plan is <br /> inherently linked to the 3-year expiration of the LDP. <br /> 29 Three years is the current expiration time frame for LDPs. <br /> 30 Text correction—decapitalized "approval". <br /> Orange County, North Carolina—Unified Development Ordinance Page 3-Ixi <br />
The URL can be used to link to this page
Your browser does not support the video tag.