Browse
Search
8.3.22 Planning Board Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2022
>
8.3.22 Planning Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2022 12:32:18 PM
Creation date
8/1/2022 12:25:22 PM
Metadata
Fields
Template:
BOCC
Date
8/3/2022
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
8.3.22 Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 9: Enforcement 165 <br /> Section 9.9: Stormwater Management <br /> (D) Once the site has been inspected and remedial work approved by the Erosion Control <br /> Officer, the responsible party may reapply for a Land Disturbing Permit and pay the <br /> appropriate fee. <br /> (E) Resumption of land disturbing activities other than those necessary to bring the site back <br /> into compliance with the 379erosion and sedimentation control provisions of this <br /> Ordinance before the reissuance of the Land Disturbing Permit shall constitute a violation <br /> of the Ordinance. <br /> (F) The person Person conducting the ' Land-Disturbing Activity may <br /> appeal the revocation of a Land Disturbing Permit following procedures set out in Section <br /> 2.27 2.2.7of this Ordinance. <br /> Section 9.9: STORMWATER MANAGEMENT <br /> 9.9.1 Inspections and Investigations <br /> (A) Site Inspections <br /> (1) Agents, officials, or other qualified persons authorized by the-Orang, County380 <br /> will periodically inspect on-site Stormwater Control Measuresstormwater Ccontrol <br /> measu es (SCMs) and illegal discharges to ensure: <br /> (a) Compliance with the North Carolina Sedimentation Pollution Control Act <br /> of 1973 ("Act" in this Section), this Ordinance, or rules or orders adopted <br /> or issued pursuant to this Ordinance; <br /> (b) The measures required in the Stormwater Management Pplan (SMP)38' <br /> being constructed in accordance with the approved piaeSMP. <br /> (c) The permanent SCMs are not in need of any maintenance including, but <br /> not limited to, the following: <br /> (i) Mowing of vegetation, <br /> (ii) Vegetation re-establishment, <br /> (iii) Tree removal (especially from wet detention ponds), <br /> (iv) Stabilization of any eroding areas, and <br /> (v) Structural (pipe, riser, dam, etc) repair. <br /> (2) Notice of the right to inspect shall be included in the letter of approval of each <br /> Stormwater Management Dian S'MP. <br /> (B) Authority to Enter Property and Conduct Investigations and Inspections <br /> (1) No person shall willfully resist, delay, or obstruct an authorized representative, <br /> employee, or agent of Orange County, while that person is inspecting or <br /> attempting to inspect a required on-site SCM. <br /> (2) The Erosion Control Officer shall have the power to conduct such investigations <br /> as deemed reasonably necessary to carry out the duties as prescribed in this <br /> Ordinance, and for this purpose to enter at reasonable times upon any property, <br /> public or private, for the purpose of investigating and inspecting the sites of any <br /> required on-site SCM. <br /> 37.Deleted "soil". <br /> 181 Consistent reference to"Orange County". <br /> 181 Consistent use of"Stormwater Management Plan (SMP)". <br /> Orange County, North Carolina—Unified Development Ordinance Page 9-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.