Browse
Search
8.3.22 Planning Board Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2022
>
8.3.22 Planning Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2022 12:32:18 PM
Creation date
8/1/2022 12:25:22 PM
Metadata
Fields
Template:
BOCC
Date
8/3/2022
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
8.3.22 Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 6: Development Standards 121 <br /> Section 6.14: Stormwater Management <br /> (1) Amendments Minor amendments to the approved SCM plans and specifications <br /> shallef the erne and/Pr then ration and m intenanne plan or manual ma„247 be <br /> approved by the Erosion Control Officer, provided that the proposed248 changes <br /> do not involve a change in the type of the SCM, a change in the location of the <br /> SCM, or an SCM area/volume&4e increase greater than 50% of the approved <br /> SCM area/volume or location of the otn infi lre 24s <br /> (2) Proposed changes shall be prepared by a North Carolina registered professional <br /> engineer or landscape architect(to the extent that th---General Statutes Chapter <br /> 89A, allows)250 and submitted for review by the Erosion Control Officer. <br /> (3) Erosion Control Officer Review <br /> (a) If the Erosion Control Officer approves the proposed changes, the <br /> owning entity of the stermwater nentrel Str„nt„reSCM shall file sealed <br /> copies of the revisions with the Erosion Control Officer. <br /> (b) If the Erosion Control Officer disapproves the proposed251 changes, the <br /> proposal shall �52 be revised and resubmitted as a new proposal. If <br /> the proposal has not been revised and is essentially the same as that <br /> already reviewed, it shall be returned to the anowning entity25s <br /> (c) The Erosion Control Officer shall report any such revisions to the Board <br /> of County Commissioners at the next available business <br /> meetin,ff Planning Director. <br /> (B) Major Amendments to Approved SCM214 Plans and Specifications <br /> (f) Amendments to theMaior amendments to the approved SCM plans and <br /> specifications of the crnn and/er then ration apd m wtepanne plan, or rnaRual <br /> which involve a change in the type of the SCM, a change in the location of the <br /> SCM, or an SCM area/volume increase greater than 50% of the approved SCM <br /> area/volume shallsize nr'E)Gatien of the ,;tr--rt .Fe ma„2s5 be approved by the <br /> Board of CountyPlanning Director256 after receiving a <br /> recommendation from the Erosion Control Officer. <br /> (2) Proposed changes shall be prepared by a North Carolina registered professional <br /> engineer or landscape architect(to the extent that the General Statute&, Chapter <br /> 89A, allows257) and submitted to and reviewed by the Erosion Control Officer. <br /> (3) Planning Director Review258 <br /> (a) If the Planning Director approves the proposed changes, the owning <br /> entity of the SCM shall file sealed copies of the revisions with the Erosion <br /> Control Officer. <br /> 2"Edit(s) based on Legal Sufficiency Review comments <br /> gas Text correction—added "proposed". <br /> zas Clarification of requirements. <br /> Zso Text corrections. <br /> Zs1 Text correction—added "proposed". <br /> 212 Edit(s) based on Legal Sufficiency Review comments <br /> 213 Consistent use of"owning entity". <br /> 211 Clarification that this sub-section is referencing"Approved SCM" Plans and Specifications. <br /> 21s Edit(s) based on Legal Sufficiency Review comments <br /> zse Consistency with current state law and Model Ordinances. <br /> Zs7 Text corrections. <br /> zss Clarification of requirements. <br /> Orange County, North Carolina—Unified Development Ordinance Page 6-111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.