Orange County NC Website
Article 6: Development Standards 119 <br /> Section 6.14: Stormwater Management <br /> A ee#;neapsealed by a rr eR g i R eer er!aRassa pe aFG h hest <br /> the exteR++ho G—e—ne-ral Statute, Cheater 89A, allow) o+o+inn <br /> thatthat thethe detedetention pond is complete and consistent with the plans <br /> and specificat'eps <br /> (b) if the_r project passes inspection and the Epesiep Gran+rol Officer aGoepts <br /> the certification deed and easements he/she shall file the deed and <br /> easements with the (bonne County Register of Heeds release p to <br /> 750% of the value of the performance bond or other security and issue a <br /> Watershed Protection Compliance Permit for the SCM 232 <br /> (G) if dies are fog end the EFGSiGp CvG,-t"r^GI vffiGGF shallreGt that the <br /> necessa pi im en+s he merle apd/er doc6 amens c ec+ed and <br /> r2Stl ted for oval. I POP GOmppletjn the im en+� shall <br /> re_inspeGted UP <br /> (2) Watershed Protection o„Compliance Permit Required Prior to Occupancy <br /> No Building Permit or Certificate of Occupancy may he issued in the absence of <br /> a valid Watershed Protection Compliance Permit <br /> (T3) Releaseae veGU ity <br /> (a) No sooner than one year after the filing date of the deed' easem�.�.�eg�_ts_andd <br /> maintenance agreement the developer may petition the Board of Count!, <br /> Commissioners to release the remaining value of the performance hnnd <br /> or ethers W <br /> /hob) Upon reseipefsaid petite Ere ' n Centre! nffiEer shall the <br /> SUM +o determine whether the Gen+rely a performing as designed apd <br /> in+ended <br /> rrccrlvccr <br /> (G) The €rosie.n r--A-.ntrA-.' r shall present he petition, inspestien reps <br /> and r enda+ions+e the Roard of County Gemmissioners <br /> /damBoard of County Cnmmi�iro n�_��grr� ReeymeoP�ni <br /> /i if the Board of County Commissioners ap oyes the report accepts the petition the developer shall deposit with Orange <br /> County a cash amount equal to that described On Section <br /> R 1/1 1 O(C)(5) after which the Board of County Commissioners <br /> shell release the performance bond or other security. <br /> �if the Rnard of Cn -Rty Cnmmissteners dees not aesept the reps <br /> and rejects the pe+i+ion it shall p vide the developer with <br /> ins+rUctiens +o c ec+ any deficiencies and all steps n <br /> eGessar <br /> for the release of the performance hoed o other security. <br /> (4)(5) Annual SCM233 Inspection Required <br /> (a) All SCMs shall be inspected by the owning entity at least on an annual <br /> basis to determine whether the contr�nrrols arcls aareSCM iS234 performing as <br /> designed and intended. <br /> (b) Records of inspections shall be submitted annually to the Erosion <br /> Control Officer on forms approved by Orange County. <br /> 233 Clarification that an annual inspection of the"SCM" is required. <br /> 114 Reference to the"SCM" rather than "controls". <br /> Orange County, North Carolina-Unified Development Ordinance Page 6-109 <br />