Browse
Search
8.3.22 Planning Board Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2022
>
8.3.22 Planning Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2022 12:32:18 PM
Creation date
8/1/2022 12:25:22 PM
Metadata
Fields
Template:
BOCC
Date
8/3/2022
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
8.3.22 Planning Board Minutes
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 6: Development Standards 118 <br /> Section 6.14: Stormwater Management <br /> (v) Removal of sediment and/or debris from the `crash ra^ck' on any <br /> �Afet,+o+on+ion nonrd „ and fil+orinlet and outlet channels, inlet <br /> and outlet pipes, forebays, trash racks, and riser or barrel <br /> structures223, and <br /> (vi) Repair of any damage/deterioration to structural aspects of wet <br /> rdo+on+ir.n nr.n.ds s ns+r„s+ord ,.,o+Ian.Js levelspreaders, anrd <br /> sand f,.tl+orsthe SCM. <br /> (c) The Plan OMP shall clearly indicate the steps that will be taken for <br /> restoring a SCM to its design specifications if an SCM224 failure occurs. <br /> (3) Landscaping and Grounds Maintenance <br /> (a) Landscaping and grounds maintenance shall be the responsibility of the <br /> owning entity. <br /> (b) Vegetation shall not be established or allowed to mature to the extent <br /> that the integrity or functionality225 of the Gentrel s+r,,,ti SCM is <br /> diminished or threatened, or to the extent of interfering with any <br /> easement or access to the SCM. <br /> (4) SCM221 Repair or Reconstruction <br /> (a) Except for general landscaping and grounds maintenance, the owning <br /> entity shall notify the-Orange227 County prior to any repair or <br /> reconstruction of the SCM. <br /> (b) After notification by the owning entity, the Erosion Control Officer shall <br /> inform the owning entity of any required additions, changes or <br /> modifications and of the time period to complete said SCM228 <br /> improvements. <br /> (c) All SCM229 improvements shall be made consistent with the approved <br /> Nplans and specifications of the SCM and the operations and <br /> maintenance plan or mane aISMP, the approved OMA, and the approved <br /> OM P.23o <br /> (C)inspections and Release of eSu'reties231 <br /> 0) County Inspestien and Reviews <br /> (a'a)__ the SCM shall ho inspected by fho �Dsien Control Officer, after the <br /> vvrvr u.rAc-rrT av� �-r�- <br /> +ity +ifia /h that k has Ieted. t this <br /> ewnm�e�rir�-rvcrrrcSiyiiiirrrer�rru n-=vvv,=rrr�u rirpr —rca-crrt <br /> I nspeGtVln the ewning entity shall n virda• <br /> a. The signed .door! related easements suwey plat fe <br /> the crnn roach,fGF filing with the QraRge GO Un+c, <br /> Register Gf hoards• and <br /> 223 Edit(s) based on Legal Sufficiency Review comments <br /> 224 Clarification that this sub-section is referencing an "SCM"failure. <br /> 22'Text correction—added "or functionality". <br /> 221 Clarification that this sub-section is referencing"SCM" repair or reconstruction. <br /> 22'Consistent reference to"Orange County". <br /> 221 Clarification that improvements are specific to"SCMs"only. <br /> 221 Clarification that improvements are specific to"SCMs"only. <br /> 231 Clarification of SCM repair or reconstruction requirements. <br /> 231 SCM Performance Guarantee requirements have been moved to Section 6.22(NEW SECTION). <br /> Orange County, North Carolina—Unified Development Ordinance Page 6-108 <br />
The URL can be used to link to this page
Your browser does not support the video tag.