Orange County NC Website
Exclusions <br />1.Offsite system monitoring fees <br />2.Desigo subscription fees <br />3.Working in areas containing hazardous materials or confined space <br />4.Cost associated with schedule acceleration or multiple unplanned phases <br />5.Costs associated with bypassing the system during construction <br />6.Creating base building auto cad drawings for the project <br />7.Ceiling and/or wall removal, replacement, patching, and painting <br />8.Overtime (except as specifically noted) <br />9.After hours work (except as specifically noted) <br />10.Additional testing due to others <br />11.Dedicated phone lines <br />12.Dedicated IP Network Drop <br />13.Performance or payment bonds <br />14.Bonding or special insurance <br />15.Fire caulking <br />16.Knox box <br />17.Shunt trip breakers <br />18.Fire Watch <br />19.Cost associated with multiple trips to the job site due to incompletion by others <br />20.Security Door lock interface <br />Page 8 of 13 <br />DocuSign Envelope ID: 0B851B7C-2813-49D4-B491-016926532516