Orange County NC Website
Inclusions <br />1.Sales Tax (if tax exempt please provide tax exempt certification) <br />2.Freight <br />3.Engineering <br />4.Project Management for Siemens Scope of work <br />5.System Commissioning and Final Pretest <br />6.Final AHJ Testing and certification <br />7.Fire Alarm Submittal to customer <br />8.Fire Alarm Submittal to AHJ <br />9.Fire Alarm Permit or Electrical Permit or costs associated with this project <br />10.Lifts <br />11.Professional Engineers stamp which may be required <br />12.Supply or installation of any electrical conduits, wire mold, cables, wiring or back boxes, and <br />equipment <br />13.As interpreted in the Fire Alarm specifications, as shown on drawings, and as defined in this proposal <br />14.Price is based on Auto-CAD electronic drawings for the project being supplied to us by others <br />15.DACT <br />16.One (1) year warranty <br />17.Customer training <br />18.Final wiring terminations to the control panel <br />19.Fire Alam submittal <br />20.Fire Alarm O&M manual <br />21.Programming <br />22.Desigo Fire Alarm Graphics <br />Page 7 of 13 <br />DocuSign Envelope ID: 0B851B7C-2813-49D4-B491-016926532516