Browse
Search
2022-316-E-AMS-Siemens Industry-ES warehouse dehumification controls to tie into existing controls
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-316-E-AMS-Siemens Industry-ES warehouse dehumification controls to tie into existing controls
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2022 11:21:44 AM
Creation date
7/28/2022 11:21:14 AM
Metadata
Fields
Template:
Contract
Date
7/27/2022
Contract Starting Date
7/27/2022
Contract Ending Date
7/28/2022
Contract Document Type
Contract
Amount
$32,960.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Work <br />We propose to furnish and install an extension of the existing Siemens Building Automation System (BAS) in <br />accordance with the plans and specifications dated 1-14-2022. <br />Includes <br />General Conditions <br />•Labor to provide Siemens standard As-Built submittals / record documents, to include the following: <br />•System architecture (Siemens BACnet IP & MSTP) <br />•Network address schedule <br />•System flow diagrams <br />•Control installation / wiring diagrams <br />•Control & Component Panel layouts <br />•Equipment / Instrumentation datasheets <br />•Point database <br />•Programming <br />•Labor to provide installation and wiring, to include the following: <br />•BMS Control and interlock wiring <br />•BMS Communications cabling between control panels <br />•Devices being wired to existing control panel <br />•Installation of BMS instruments and devices <br />•Assistance with existing controls demo work <br />•Cabling in conduit <br />•Provision of Lift <br />•Labor to provide Siemens standard startup & checkout, to include the following: <br />•Point database <br />•Point-to-point <br />•Sequence of Operations verification <br />•Labor to provide Siemens project management, to include the following: <br />•Project meeting attendance <br />•Project documentation requirements <br />•Coordination with trades <br />•Subcontractor management <br />•Material ordering and delivery coordination <br />•Project turnover documentation support <br />•Pricing is based on a 40 hour work week <br />•1-year parts and labor warranty upon beneficial use of systems <br />BASE <br />•Siemens to provide all devices and programming to control the following equipment per the <br />sequences of operations (Expansion of existing controller): <br />Page 4 of 8 <br />DocuSign Envelope ID: 9CAF3B65-A451-4BB1-9BEA-5B33EED7506D
The URL can be used to link to this page
Your browser does not support the video tag.