Browse
Search
2022-314-E-AMS-Siemens Industry-Efland EMS station fire alarm system
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-314-E-AMS-Siemens Industry-Efland EMS station fire alarm system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2022 11:19:26 AM
Creation date
7/28/2022 11:18:51 AM
Metadata
Fields
Template:
Contract
Date
7/27/2022
Contract Starting Date
7/27/2022
Contract Ending Date
7/28/2022
Contract Document Type
Contract
Amount
$165,540.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Clarifications <br />1.Siemens will be providing a Turnkey Fire Alarm Installation for this project. <br />2.Siemens will provide the fire alarm permit, review and inspection fees. <br />3.Siemens will need to be provided with architectural backgrounds in Auto CAD files, <br />4.approved fire protection report, and full set of construction documents, free of charge. <br />5.Siemens will provide submittal sets of drawings, as well as two construction sets, and two as built <br />sets.An electronic and hard set of approved and stamped as builds will be provided to the Owner <br />upon the project completion. <br />6.Owner will need to allow Siemens full and complete access to the property for the duration of the <br />project. <br />7.All scheduling and phasing will need to have the Owner's input and will require the Owner's <br />cooperation to complete during the allotted time. <br />8.Submittals may take between 4-6 weeks for approval through the Fire Department. <br />9.All work to be performed during normal working hours of Monday thru Friday, 7:00am to 4:00pm. <br />10.This price is firm for 30 days from the date of this proposal. <br />11.If this proposal includes a Smoke Control/Smoke Management system, Siemens must be provided <br />Smoke Control/Smoke Management Drawings which define all Zone Boundaries, location, type of <br />equipment used, and a detailed input/output matrix or sequence of operations.In the event that such <br />information is provided post-award or such information is discovered by Siemens during installation of <br />the scope, a change order for additional time and an increase in cost may be required due to the <br />information differing from assumptions that Siemens had to make in developing the scope. <br />Page 8 of 12 <br />DocuSign Envelope ID: 2A771244-12EB-4BF6-9FBA-2136D0BB94EA
The URL can be used to link to this page
Your browser does not support the video tag.