Browse
Search
2022-314-E-AMS-Siemens Industry-Efland EMS station fire alarm system
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-314-E-AMS-Siemens Industry-Efland EMS station fire alarm system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2022 11:19:26 AM
Creation date
7/28/2022 11:18:51 AM
Metadata
Fields
Template:
Contract
Date
7/27/2022
Contract Starting Date
7/27/2022
Contract Ending Date
7/28/2022
Contract Document Type
Contract
Amount
$165,540.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Revised 06/21 <br /> <br />1 <br /> [Departmental Use Only] <br /> TITLE Efland EMS FA <br /> FY 2021-2022 <br />NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT UNDER $250,000.00 <br />ORANGE COUNTY <br /> <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called “Agreement”), made as of the 5th day <br />of May, 2022, by and between Siemens Industry, Inc, (hereinafter called the “Contractor”), and Orange <br />County, a political subdivision of the State of North Carolina, (hereinafter called the “County,” “Orange <br />County,” or “Owner”). <br /> <br />W I T N E S S E T H: <br /> <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> <br /> <br />1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the Request for Proposals, Proposal, <br />Construction Drawings, and Written Specifications. The Contract Documents form the Contract. In the <br />event of any inconsistency between or among the Contract Documents the Contract Documents shall be <br />interpreted in the following order of priority: <br /> <br />a. This Agreement. <br /> <br />b. Designer Approved Bulletins and Field Orders. <br /> <br />c. Request for Proposals and addenda thereto. <br /> <br />d. Proposal. <br /> <br /> <br />2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform all of the work <br />required by this Agreement within the time period stipulated in a written Notice-to-Proceed to be <br />executed by the Contractor and Owner and in accordance with the following enumerated documents, <br />which are made a part hereof as if fully contained herein: <br /> <br />a. Construction Drawings prepared by Stewart-Cooper-Newell Architects (Sheet 0.00 Cover <br />Sheet, 1.00 Apendix B, 1.10 Life Safety Plan, 1.70 Wall Types, 1.71 UL Detail & <br />Assembly Types, C-000 COVER SHEET, C-001 PROJECT NOTES C-100 OVERALL <br />EXISTING CONDITIONS PLAN, C-110 EXISTING CONDITIONS PLAN, C-210 SITE <br />DEMOLITION PLAN, C-300 OVERALL SITE LAYOUT PLAN, C-310 SITE LAYOUT <br />PLAN, C-410 EROSION CONTROL PLAN - STAGE 1, C-411 EROSION CONTROL <br />PLAN - STAGE 2, C-412 EROSION CONTROL PLAN - STAG,E 3, C-413 EROSION <br />CONTROL PLAN - STAGE 4, C-421 EROSION CONTROL PLAN - NPDES NOTES, <br />C-422 EROSION CONTROL PLAN - NPDES NOTES, C-510 GRADING PLAN, C-710 <br />SITE UTILITY PLAN, C-900 SITE DETAILS, C-910 EROSION CONTROL DETAILS, <br />C-911 EROSION CONTROL DETAILS, C-912 EROSION CONTROL DETAILS, C-920 <br />DocuSign Envelope ID: 2A771244-12EB-4BF6-9FBA-2136D0BB94EA
The URL can be used to link to this page
Your browser does not support the video tag.