Orange County NC Website
Inclusions <br />1.Sales Tax (if tax exempt please provide tax exempt certification) <br />2.Freight <br />3.Engineering <br />4.Project Management for Siemens Scope of work <br />5.System Commissioning and Final Pretest <br />6.Final AHJ Testing and certification <br />7.Fire Alarm Submittal to customer <br />8.Fire Alarm Submittal to AHJ <br />9.Fire Alarm Permit or Electrical Permit or costs associated with this project <br />10.Professional Engineers stamp which may be required <br />11.Supply or installation of any electrical conduits, almond color wire mold, cables, wiring or back boxes, <br />and equipment <br />12.As interpreted in the specifications, as shown on drawings, and as defined in this proposal <br />13.Price is based on Auto-CAD electronic drawings for the project being supplied to us by others <br />14.DACT <br />15.One (1) year warranty <br />16.Customer training <br />17.Final wiring terminations to the control panel <br />18.Fire Alam submittals <br />19.Fire Alarm O&M manuals <br />20.Programming <br />21.Desigo Fire Alarm Graphics <br />Page 15 of 20 <br />DocuSign Envelope ID: 3031A07D-A253-40EC-8979-66EBF03A5724