Browse
Search
Agenda - 03-19-2002 - 9a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 03-19-2002
>
Agenda - 03-19-2002 - 9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2017 4:22:27 PM
Creation date
8/29/2008 10:37:22 AM
Metadata
Fields
Template:
BOCC
Date
3/19/2002
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9a
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A44ach rnen+ 3 <br /> 9 <br /> CHAPEL HILL - CARRBORO CITY SCHOOLS <br /> 750 Merritt Mill Road <br /> Chapel Hill, North Carolina 27516-2881 <br /> Telephone: (919) 967-8211 <br /> Fax: (919) 969-2474 <br /> Neil G. Pedersen Steve Scroggs, Assistant Superintendent <br /> Superintendent for Support Services <br /> William J. Mullin, Director of Facilities <br /> Management <br /> MEMORANDUM TO: Steve Scroggs <br /> FROM: Bill Mullin <br /> SUBJECT: Elementary School #9 <br /> Construction Bids <br /> DATE: February 15, 2002 <br /> On February 7, 2002, bids were opened for the construction of Elementary School #9. <br /> The project received excellent participation from contractors. Competitive bids were <br /> received from ten general contractors, six plumbing contractors, eight mechanical <br /> companies, eight electric companies, and five companies that bid on the fire protection <br /> sprinkler system. State law permits projects of this scope to be bid as a single and <br /> multi prime project and Elementary School #9 was bid in both formats. <br /> The bid documents were prepared with alternates. This structure offers flexibility in <br /> awarding contracts within the project budget and provides a mechanism for selecting <br /> desired upgrades. Additionally, alternates identify the cost associated with speck <br /> aspects of work. <br /> The attached Bid Tabulation prepared by the architects lists each contractor's <br /> submitted costs. The low single prime contractor bid submitted by The Resolute <br /> Building Co. in the amount of$10,830,000 is recommended. Accepting 12 of the 14 <br /> alternates is also recommended. Alternate #2, specifying a contractor to perform door <br /> and hardware work, is not recommended due to cost. Alternate#10, an ice storage <br /> system, does not meet the life cycle cost analysis criteria established prior to the bid <br /> and is not economically viable. The total cost of the recommended bid with 12 <br /> altemates is $10,921,250 and is within budget. <br />
The URL can be used to link to this page
Your browser does not support the video tag.