Browse
Search
2022-302-E-AMS-Summit Design & Engineering Services-Efland EMS Construction materials testing & special inspections
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-302-E-AMS-Summit Design & Engineering Services-Efland EMS Construction materials testing & special inspections
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2022 2:08:54 PM
Creation date
7/25/2022 2:07:58 PM
Metadata
Fields
Template:
Contract
Date
7/21/2022
Contract Starting Date
7/21/2022
Contract Ending Date
7/24/2022
Contract Document Type
Contract
Amount
$60,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />STATEMENT OF SPECIAL INSPECTIONS (NCSBC) SOSI-5 <br /> <br /> <br />Schedule of Special Inspection Services <br />Soils <br /> <br /> <br />Item <br /> <br />Qualifications Scope <br /> <br />1.Site Preparation SI <br /> <br /> Determine that site has been prepared in accord- <br />ance with the approved soils report <br />2. Fill Placement SI <br /> <br /> Determine that material used and maximum lift <br />thickness comply with approved soils report <br />3. Density Evaluation SI / ITL <br /> <br /> Determine that in-place dry density of the compact- <br />ed fill complies with approved soils report <br /> <br /> <br />Schedule of Special Inspection Services <br />Wall Panels and Veneers <br /> <br />Item <br /> <br />Qualifications Scope <br /> <br />1. Anchorage SI Inspect size and location of anchorage of veneer. <br />2. Material Certification SI <br />SI <br />SI <br /> Collect mix design for mortar <br /> Collect mix design for grout <br /> Certificates of Compliance for masonry constituents <br />3. Mixing of Mortar & <br />Grout <br />SI / ITL Periodic inspection of site prepared mortar <br />4. Installation of veneer SI <br /> <br /> <br />SI / SER <br /> Inspection of construction of mortar joints, prior to be- <br />ginning masonry construction and during construction <br /> Verify size and location of structural elements <br />5. Reinforcement In- <br />stallation <br />SI / SER <br /> <br />SI / SER <br /> Verify location of reinforcement and connections to <br />structure prior to construction <br /> Prior to grouting verify size, grade, and placement of <br />reinforcement and connection of masonry to structural <br />frame <br />6. Grouting Operations SI Continuous observation of the placement of all grout, <br />conforming cleanliness of grout space placement of <br />the reinforcing connectors. <br />7. Weather Protection SI Periodically verify protection techniques for construc- <br />tion of masonry below 40ºF and above 90ºF <br />8. Observation of the <br />Evaluation of Masonry <br />Strength <br />SI Continuous observation of the preparation of grout <br />specimens, mortar specimens and or prisms. <br /> <br /> <br /> <br />DocuSign Envelope ID: 86DCBF93-1313-40D4-B4EA-5885A3D5CEDB
The URL can be used to link to this page
Your browser does not support the video tag.