Orange County NC Website
<br />STATEMENT OF SPECIAL INSPECTIONS (NCSBC) SOSI-4 <br /> <br /> <br />Schedule of Special Inspection Services <br />Cast-in-Place Concrete <br /> <br />Item Qualifications Scope <br />1. Mix Design/Material <br />Certifications <br />SER / SI  Collect mix designs and verify appropriate mix use <br />during specific installation <br />2. Reinforcement Instal- <br />lation <br />SER / SI <br /> <br />SI <br /> Periodic inspection of reinforcing steel and welded <br />wire fabric <br /> Collection of certified mill test reports <br />3. Concrete Place- <br />ment/Monitoring Fresh <br />Concrete, Sampling & <br />prep of test samples <br />SI <br /> <br />SI / ITL <br /> <br /> <br />SI <br /> Continuous inspection of cast-in-place concrete <br />placement <br /> Continuous monitoring of sampling of fresh con- <br />crete, slump test, air content test, temperature of <br />concrete and creation of strength test specimens <br /> Continuous inspection of bolts to be installed in <br />concrete prior to and during placement <br />4. Curing & Protection SI  Periodic inspections of curing techniques <br />5. Structural Precast <br />Concrete Members <br />SER / SI  Periodic inspection of attachment of precast mem- <br />bers <br /> <br />Schedule of Special Inspection Services <br />Masonry <br /> <br />Item Qualifications Scope <br />1. Material Certification SI <br />SI <br />SI <br /> Collect mix design for mortar <br /> Collect mix design for grout <br /> Certificates of Compliance for masonry constituents <br />2. Mixing of Mortar & <br />Grout <br />SI  Periodic inspection of site prepared mortar <br />3. Installation of Mason- <br />ry <br />SI <br /> <br /> <br />SER / SI <br /> Inspection of construction of mortar joints, prior to <br />beginning masonry construction and during con- <br />struction <br /> Verify size and location of structural elements <br />4. Reinforcement Instal- <br />lation <br />SER / SI <br /> <br />SER / SI <br /> Verify location of reinforcement and connections to <br />structure prior to construction <br /> Prior to grouting verify size, grade, and placement of <br />reinforcement and connection of masonry to struc- <br />tural frame <br />5. Grouting Operations SI  Continuous observation of the placement of all <br />grout, conforming cleanliness of grout space place- <br />ment of the reinforcing connectors. <br />6. Weather Protection SI  Periodically verify protection techniques for con- <br />struction of masonry below 40ºF and above 90ºF <br />7. Observation of the <br />Evaluation of Masonry <br />Strength <br />SI / ITL  Continuous observation of the preparation of grout <br />specimens, mortar specimens and or prisms. <br /> <br /> <br />DocuSign Envelope ID: 86DCBF93-1313-40D4-B4EA-5885A3D5CEDB