Browse
Search
2022-302-E-AMS-Summit Design & Engineering Services-Efland EMS Construction materials testing & special inspections
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-302-E-AMS-Summit Design & Engineering Services-Efland EMS Construction materials testing & special inspections
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2022 2:08:54 PM
Creation date
7/25/2022 2:07:58 PM
Metadata
Fields
Template:
Contract
Date
7/21/2022
Contract Starting Date
7/21/2022
Contract Ending Date
7/24/2022
Contract Document Type
Contract
Amount
$60,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Unit Name Unit Price Unit Name Unit Price <br />ABC Stone Proctor (ASTM D698 or ASTM D1557)175.00$ Each Mob/Demob (ATV Water Buggie)*500.00$ Each <br />Atterberg Limits (ASTM D4318)70.00$ Each Mob/Demob (Drill Rig)*500.00$ Each <br />CBR (3 point)450.00$ Each Additional Mileage (beyond 50 mile radius)5.00$ Mile <br />CMU Testing (ASTM C140)225.00$ Each Drill/Sample 0-50 mud rot up to 3 7/8"14.00$ Foot <br />Concrete Compressive Strength (ASTM C39)18.00$ Each Drill/Sample 50-100 mud rot up to 3 7/8"15.50$ Foot <br />Concrete Core Compres. Strength (ASTM C42)35.00$ Each Drill/Sample 100-150 mud rot up to 3 7/8 17.00$ Foot <br />Engineering Classification (ASTM D2487)4.00$ Each Drill/Sample 0-50 Hollow St 2 1/4"14.00$ Foot <br />Flexural Strength of Concrete (ASTM C78)40.00$ Each Drill/Sample 50-100 Hollow St 2 1/4"15.50$ Foot <br />Grout Compressive Strength (ASTM C1019)30.00$ Each Borehole Casing (Steel, NW)7.00$ Foot <br />Hydrometer Analysis (ASTM D7928/D422)60.00$ Each Borehole Casing (Steel, HW)9.00$ Foot <br />Lightweight Concrete Density (ASTM C567)30.00$ Each Auger Probes 0-50 ft.10.00$ Foot <br />Modified Proctor (ASTM D1557)175.00$ Each Rock Coring 0-50ft. BGS (NQ2)49.00$ Foot <br />Mortar Compressive Strength (ASTM C109)15.00$ Each Rock Coring 50-100 ft. BGS (NQ2)55.00$ Foot <br />Natural Moisture (ASTM D2216)8.00$ Each Rock Coring 100-150 ft. BGS (NQ2)60.00$ Foot <br />Particle Size Sieve Analysis ASTM D6913/D422 80.00$ Each Rock Coring 150+ ft. BGS (NQ2)65.00$ Foot <br />Soil-Cement Proctor 250.00$ Each Extra Split-Spoon Samples (0-50ft)30.00$ Each <br />SP Gravity/Density Asphalt Cores (ASTM D2726)35.00$ Each Extra Split-Spoon Samples (50-100ft)55.00$ Each <br />Specific Gravity Soils ASTM D854 80.00$ Each Extra Split-Spoon Samples (100-150)100.00$ Each <br />Standard Proctor (ASTM D698)150.00$ Each Bulk Samples 40.00$ Each <br />Wash #200 Sieve Analysis (ASTM D1140)40.00$ Each Shelby Tube Samples 110.00$ Foot <br />NCDOT Atterberg Limits & Grain Size 150.00$ Each Piezometers (labor & mat'ls,ex borehole)18.00$ Foot <br />Unconfined Compressive Strenth of Soils Quote Each Materials(hole plug-abandoned holes)10.00$ Each <br />Soils Consolidations Quote Each Grouting Boreholes -neat cement up to 5"25.00$ Foot <br />ABC Gradation 150.00$ Each Hauling Water 175.00$ Hour <br />pH of Soil (AASHTO T-289)20.00$ Each Water Truck/Water Buggie 250.00$ Day <br />Visual Manual Classification 50.00$ Each Standby/Moves/Cleanup/Clearing w Chainsaw 175.00$ Hour <br />Particle Size Sieve Analysis (ASTM D6913/D422)80.00$ Each Rock Coring/ Rotary Setup 130.00$ Each <br />Visual Manual Classification 60.00$ Each Additional Helper (requested by Client)400.00$ Day <br />Daily Rate - Drill Rig & Crew - 8 hours*2,000.00$ Day <br />Unit Name Daily Rate (Half Day) - Drill Rig & Crew*1,000.00$ Day <br />1 Man Survey Crew 135.00$ Hour Borehole Casing using Casing Advancer 20.00$ Foot <br />2 Man Survey crew 170.00$ Hour Vehicle Mileage 0.58$ Mile <br />3 Man Survey Crew 200.00$ Hour Surcharge Hard Drilling (> 50 bpf)4.00$ Foot <br />1 Man Laser Scanning Crew 175.00$ Hour Per Diem Daily Rate 150.00$ Each <br />2 Man Laser Scanning Crew 245.00$ Hour <br />Nuclear Density Gauge 30.00$ Day <br />Ultrasonic Equipment 100.00$ Day <br />Dipstick (Floor Flatness Profiler)100.00$ Day <br />Coring Equipment 250.00$ Day <br />Prices are in effect for 30 days from the date of proposal <br />Rates are subject to a 5% Annual Escalation <br />Rev. 3.11.2022 <br />Survey Rates <br />Unit Price <br />Equipment Rates <br />Laboratory Rates Drilling Rates <br />Summit Design and Engineering Services Standard Unit Rates <br />DocuSign Envelope ID: 86DCBF93-1313-40D4-B4EA-5885A3D5CEDB
The URL can be used to link to this page
Your browser does not support the video tag.