Orange County NC Website
Proposal for CMT & SI Services Summit Proposal # T22-0044 <br />Orange County Efland EMS Station July 14, 2022 <br />Efland, North Carolina <br /> <br /> <br />4 <br />Each of these organizations is part of the National Institute of Standards and Technology. We have also <br />been inspected and accredited by the Soil and Materials Laboratory of NCDOT. Laboratory testing will be <br />performed in accordance with the project document requirements to evaluate that materials comply with <br />project requirements. Results of laboratory testing will be provided to the construction manager and <br />designated project team members as soon as practicably available. <br /> <br />We anticipate that testing will be required for backfill material and concrete cylinders. Samples collected <br />from the job site will be secured and returned to our laboratory for testing, as required. Our budget includes <br /> <br />laboratory testing of soils, including maximum dry unit weight/optimum moisture curves, Atterberg limits, <br />and No. 200 wash sieves for 3 samples and compressive strength testing for up to 75 concrete cylinders. <br /> <br />Task 008 – Project Management and Engineering Consultation <br /> <br />Our project organization will include various field testing and inspections staff working under the <br />supervision of Matt Lill, PMP who will oversee the administrative functions for the project, including <br />assignment of appropriate field personnel, review of field data, laboratory data, inspection reports, and <br />communication the following with project team personnel and owner: <br /> <br />• The results of our field testing and inspections for each day will be summarized in a daily field report, <br />with all results communicated to appropriate on site personnel. <br />• Unusual occurrences will be communicated in a timely manner. <br />• Scheduling conflicts do to contractor error, work cancellations upon Summit’s arrival, retesting and <br />non-compliance testing, and contractor’s convenience testing will be tracked throughout project and <br />reported to owner for tracking purposes of appropriate back charges to contractor. <br />• Non-conforming items that are not corrected on the same date that they are initially observed, will <br />be communicated to the owner, building official, general contractor, and design team immediately. <br />• The results of concrete, grout and mortar compressive strength testing will be available electronically <br />to the project team within 48 hours, as the tests are performed. Test results will be available through <br />e-mail, and summarized in our monthly summary report. <br />• A typed final report of our services will be prepared by our Project Manager, reviewed and sealed by <br />our Registered Engineer, and distributed to specified members of the project team on a monthly <br />basis, as well as a Final Report at the end of project. <br /> <br />The project will be closely managed to identify potential budget and schedule impacts during the course of <br />the project. Summit’s project manager will also monitor field operations for possible out-of-scope items that <br />develop during the course of the project that are not included in this proposal and preliminary fee estimate. <br />We have included budget for construction kickoff meeting, technical consultation and for special site <br />meetings due to unanticipated conditions or design changes during construction. Since this scope cannot be <br />fully defined at this time, we allocated budget based on prior projects of similar nature. <br /> <br />DocuSign Envelope ID: 86DCBF93-1313-40D4-B4EA-5885A3D5CEDB