Browse
Search
2022-302-E-AMS-Summit Design & Engineering Services-Efland EMS Construction materials testing & special inspections
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-302-E-AMS-Summit Design & Engineering Services-Efland EMS Construction materials testing & special inspections
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2022 2:08:54 PM
Creation date
7/25/2022 2:07:58 PM
Metadata
Fields
Template:
Contract
Date
7/21/2022
Contract Starting Date
7/21/2022
Contract Ending Date
7/24/2022
Contract Document Type
Contract
Amount
$60,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Summit Design and Engineering Services 17 <br />3 –EXPERIENCE AND PAST PERFORMANCE <br />May 9,2019 <br />RE:Summit Design and Engineering Services <br />UNC CH Media and Communication Center Project <br />To whom it may concern: <br />Summit Design and Engineering Services was the 3rd Party Special Inspections firm we worked <br />with on the new Athletics Media Center project in Chapel Hill.Summit’s Engineers were <br />instrumental and provided a hands on approach during installation of deep foundations.Also, <br />Summit’s timely communication with both myself,our superintendent,and the design team <br />during construction of the other foundation elements and superstructure assisted us greatly with <br />implementing field modifications and keeping the project moving forward.As the General <br />Contractor on this project this communication was paramount in allowing us to keep our project <br />on schedule.Summit’s lead inspector was very knowledgeable and assisted our superintendent <br />and subcontractors with walking pre-pour inspections.Reports with items requiring corrective <br />actions were sent out each day to the project team,which allowed our team to present the <br />designers with corresponding RFI’s. <br />We look forward to the opportunity to work with Summit on future projects. <br />Respectfully, <br />Jeremy Higgins <br />Project Manager <br />Frank L.Blum Construction Company <br />Provide (3) Reference letters from ONE of the projects listed in your experience. One letter each from the following: Owner, Architect/Engineer, and General Contractor. <br />DocuSign Envelope ID: 86DCBF93-1313-40D4-B4EA-5885A3D5CEDB
The URL can be used to link to this page
Your browser does not support the video tag.