Browse
Search
2022-302-E-AMS-Summit Design & Engineering Services-Efland EMS Construction materials testing & special inspections
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-302-E-AMS-Summit Design & Engineering Services-Efland EMS Construction materials testing & special inspections
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2022 2:08:54 PM
Creation date
7/25/2022 2:07:58 PM
Metadata
Fields
Template:
Contract
Date
7/21/2022
Contract Starting Date
7/21/2022
Contract Ending Date
7/24/2022
Contract Document Type
Contract
Amount
$60,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Summit Design and Engineering Services 16 <br />3 –EXPERIENCE AND PAST PERFORMANCE <br />May 9,2019 <br />Mr.Jeff Elliott,PE <br />Summit Design and Engineering Services <br />504 Meadowlands Drive <br />Hillsborough,NC 27278 <br />RE:Recommendation of Services <br />Jeff: <br />Summit should be proud of its role as the Special Inspector of Record on the new Carolina <br />Athletics Media and Communications Center project on the University of North Carolina - <br />Chapel Hill campus.As you are aware this project is nestled in one of the busiest destinations <br />on campus and required careful due diligence. <br />On behalf of the Architect of Record cra,Inc,I am pleased to recommend your professional <br />staff.Summit performed well throughout the duration of the Project.The communication and <br />reporting were clear and concise which provided our team with a level of comfort the intent of <br />the design was being implemented in the field.Routinely Summit's lead inspector would sit in on <br />weekly meetings to discuss project progress and provide information related to inspections and <br />testing,as well as, call members of the Design Team throughout the week to discuss <br />observations in the field.The team-oriented approach and quality of information provided <br />allowed timely decisions to be made which permitted the Contractor to perform without much <br />hesitation.We appreciated the report distributions and weekly summaries being faithfully sent <br />out to the team.Without those reports the pertinent information would not have been at our <br />fingertips. <br />Thanks to your Team for all their diligent work.We look forward to working together with <br />Summit on future Projects. <br />Sincerely, <br />Theodore B.Clippinger,AIA,NCARB,LEED AP <br />Project Architect <br />Provide (3) Reference letters from ONE of the projects listed in your experience. One letter each from the following: Owner, Architect/Engineer, and General Contractor. <br />DocuSign Envelope ID: 86DCBF93-1313-40D4-B4EA-5885A3D5CEDB
The URL can be used to link to this page
Your browser does not support the video tag.