Browse
Search
2022-302-E-AMS-Summit Design & Engineering Services-Efland EMS Construction materials testing & special inspections
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-302-E-AMS-Summit Design & Engineering Services-Efland EMS Construction materials testing & special inspections
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2022 2:08:54 PM
Creation date
7/25/2022 2:07:58 PM
Metadata
Fields
Template:
Contract
Date
7/21/2022
Contract Starting Date
7/21/2022
Contract Ending Date
7/24/2022
Contract Document Type
Contract
Amount
$60,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Summit Design and Engineering Services 14 <br />3 –EXPERIENCE AND PAST PERFORMANCE <br />SERVICES PROVIDED: <br />CMT & SI <br />SIZE: <br />13,643 SF <br />COST (and E&Os): <br />$4,775,000 (n/a) <br />DATES: <br />2018-2020 <br />TIME ADHERENCE: <br />On Schedule / Under Budget (1%) <br />FEE (and FEE %): <br />$43,500 (0.91%) <br />CLIENT CONTACT <br />Chris Glenn <br />919-201-6649 <br />chris.glenn@facilities.unc.edu <br />CONSTRUCTION CONTRACTOR <br />Jeremy Higgins <br />984-960-9877 <br />jhiggins@fblum.com <br />UNC Media And Communications Building <br />Chapel Hill, NC <br />Summit recently provided Special Inspections for the two-story 13,643- <br />square-foot addition to the existing Koury Natatorium building located on <br />UNC Chapel Hill’s campus. Site construction consisted of earthwork and <br />grading, subgrade evaluation, soil density/compaction testing, utility <br />installation and relocation, stormwater. Construction of the structure <br />consisted of deep foundations, reinforced cast-in-place concrete, slab-on- <br />grade, elevated slab-on-deck, and load-bearing CMU masonry construction <br />and structural steel framing. <br />Provide (3) Reference letters from ONE of the projects listed in your experience. One letter each from the following: Owner, Architect/Engineer, and General Contractor. <br />DocuSign Envelope ID: 86DCBF93-1313-40D4-B4EA-5885A3D5CEDB
The URL can be used to link to this page
Your browser does not support the video tag.