Orange County NC Website
Summit Design and Engineering Services 13 <br />3 –EXPERIENCE AND PAST PERFORMANCE <br />SERVICES PROVIDED: <br />CMT & SI <br />SIZE: <br />14,954 SF <br />COST (and E&Os): <br />$10,400,000 (n/a) <br />DATES: <br />2019-2020 <br />TIME ADHERENCE: <br />On Schedule / Under Budget (1%) <br />FEE (and FEE %): <br />$94,500 (0.90%) <br />CLIENT CONTACT <br />Bruce E. Miller, PE <br />704-336-4469 <br />bruce.miller@charlottenc.gov <br />CONSTRUCTION CONTRACTOR <br />Jeff Humbert (Turner Construction) <br />919-220-1141 <br />jhumbert@tcco.com <br />CMPD Independence Division Station <br />Charlotte, NC <br />This project will consist of new construction for a two-story 14,954 SF <br />CMPD Independence Division Station facility. The project will also <br />consist of large parking areas, stormwater control measures and <br />hardscapes. This building is located at 5833 East Independence Blvd. in <br />Charlotte. Construction primarily consisted of: utility installation and re- <br />location, earthwork grading, typical shallow foundations, reinforced <br />concrete, grade slabs and elevated slabs, masonry construction, structural <br />steel framing, paving and hardscapes. The contractor will receive notice to <br />proceed in September 2019 with Summit’s services beginning soon <br />thereafter. Substantial <br />completion for the project <br />is scheduled for July <br />2020. <br />City Of Durham Fire Station #2 <br />Durham, NC <br />SERVICES PROVIDED: <br />CMT & SI <br />SIZE: <br />10,000 SF <br />COST (and E&Os): <br />$3,500,000 (n/a) <br />DATES: <br />2018-2019 <br />TIME ADHERENCE: <br />On Schedule / Under Budget (1%) <br />FEE (and FEE %): <br />$18,000 (0.51%) <br />CLIENT CONTACT <br />Lisa R. Smith <br />919-560-4197 <br />lisa.smith@durhamnc.gov <br />CONSTRUCTION CONTRACTOR <br />Darryl E. Kellough <br />919-220-1141 <br />dkellough@southsideco.com <br />Summit provided Geotechnical, CMT and Special Inspections services <br />during construction and renovation of the existing one-story 10,000 SF City <br />of Durham Fire Station #2 facility. The project will also consist of large <br />parking areas, stormwater control measures and hardscapes. This building is <br />located at 1001 Ninth Street in Durham, North Carolina. Construction <br />primarily consisted of: utility installation and re-location, earthwork grading, <br />typical shallow foundations, reinforced concrete, grade slabs, paving and <br />hardscapes. <br />DocuSign Envelope ID: 86DCBF93-1313-40D4-B4EA-5885A3D5CEDB