Orange County NC Website
Summit Design and Engineering Services 12 <br />3 –EXPERIENCE AND PAST PERFORMANCE <br />SERVICES PROVIDED: <br />CMT & SI <br />SIZE: <br />80,939 SF <br />COST (and E&Os): <br />$36,000,000 (n/a) <br />DATES: <br />2019-2021 <br />TIME ADHERENCE: <br />On Schedule / Under Budget (1%) <br />FEE (and FEE %): <br />$275,238 (0.76%) <br />CLIENT CONTACT <br />Angel Barnes (Orange County) <br />919-245-2628 <br />abarnes@orangecountync.gov <br />CONSTRUCTION CONTRACTOR <br />Blair Bordeaux (Bordeaux) <br />919-220-1141 <br />blair@bordeauxconstruction.com <br />Orange County Detention Facility <br />Hillsborough, NC <br />Summit provided CMT and Special Inspections services on the new <br />Northern Campus Expansion project for Orange County. The project <br />consisted of a new 17,247 SF environment and agricultural center, a new <br />8,692 SF parks operations base, and a new 55,000 SF 2-story detention <br />facility. Summit provided CMT and SI of earthwork and grading, utility <br />installation and relocation, typical shallow foundations, foundation <br />drainage system, column footings, reinforced concrete, slab on grade and <br />elevated slab on metal decking, reinforced masonry, structural steel <br />framing, parking lot construction, and concrete and asphalt paving. <br />City Of Charlotte Fire/Emergency Response Station #43 <br />Charlotte, NC <br />SERVICES PROVIDED: <br />CMT & SI <br />SIZE: <br />12,802 SF <br />COST (and E&Os): <br />$9,200,000 (n/a) <br />DATES: <br />2019-2020 <br />TIME ADHERENCE: <br />On Schedule / Under Budget (1%) <br />FEE (and FEE %): <br />$63,600 (0.68%) <br />CLIENT CONTACT <br />Jonathan H. Sossamon, Jr., PE <br />704-609-7290 <br />jonathan.sossamon@charlottenc.govCONSTRUCTION CONTRACTOR <br />Darryl E. Kellough (Southside) <br />919-220-1141 <br />dkellough@southsideco.com <br />Summit provided Geotechnical, CMT and Special Inspections services <br />during design and construction of the new one-story 12,802 SF fire station <br />and supporting drive lanes, parking lot and hardscapes. This new fire station <br />is located at 421 Clanton Road in Charlotte. The facility will include <br />construction of a new 3-bay fire station with offices, exercise room, kitchen, <br />living quarters, sleeping quarters, toilet and shower facilities, and enclosed <br />apparatus bay for emergency vehicle parking. Construction primarily <br />consisted of: utility installation and re-location, earthwork grading, typical <br />shallow foundations, <br />reinforced concrete, IFC <br />masonry load bearing walls, <br />structural steel framing, <br />concrete and asphalt paving <br />and hardscapes. <br />DocuSign Envelope ID: 86DCBF93-1313-40D4-B4EA-5885A3D5CEDB