Orange County NC Website
Quote #: 00039773 <br /> <br />1.800.838.7927 | dc-group.com Page 8 of 9 DCG-QPM-FRM0004 11/04/2020 <br />DC GROUP STANDARD TERMS AND CONDITIONS <br /> <br />We are pleased to provide the following services proposed for your power quality equipment. Please refer to the Scopes of Work (SOW) for <br />descriptions of service coverage and exclusions. Additional or different terms proposed by Owner, whether in a purchase order or otherwise, <br />shall not be binding on DC Group. <br /> <br />1. Definitions <br />As used in this Agreement: (1.1) "Power Module" shall mean the electronics portion of an uninterruptible power supply (a “UPS”); (1.2) "Batte ry" <br />shall mean the electric storage battery portion of a UPS; (1.3) "Power System" shall mean the Power Module and Battery; (1.4) "Owner" shall <br />mean the owner of the Power System being serviced under this Agreement; (1.5) "Contractor" shall mean DC Group Inc.; (1.6) “E quipment” <br />shall mean the equipment listed on the attached Quote(s). <br />2. Owner's Responsibility <br />A. Communication Owner shall communicate solely with contractor regarding all service and facility requirements which arise out of or related <br />to this agreement. To assist facilitating this requirement, escalation contacts and procedures will be provided upon executio n of said <br />agreement. <br />B. Safety Owner shall, at all times while Contractor is providing services under this Agreement, have a representative present at the <br />maintenance sites at no cost to, and for the safety of, Contractor. If conditions at the Owner’s site are deemed unsafe, Contractor shall have no <br />obligations to deliver services or goods to that site until the unsafe conditions are resolved. <br />C. Access So that Contractor may perform its obligations under this Agreement, Owner shall grant ready access to the Equipment subject to <br />reasonable security requirements. <br />D. Equipment Owner hereby represents and warrants to Contractor that each item of Equipment which has not been maintained exclusively by <br />Contractor under a maintenance and service contract since its initial installation has been properly maintained and serviced in accordan ce with <br />the applicable operating manual supplied with the item prior to the date of commencemen t of the initial term of this Agreement. Contractor shall <br />not be responsible for the cost of any repairs caused by violation of this warranty. If, after the execution of this Agreemen t, Owner makes any <br />modifications to the Equipment or to equipment associated with the Equipment, or changes the location of any of the Equipment, Owner shall <br />notify Contractor of the changes, Contractor shall assess the impact of the changes and, if Contractor’s assessment is that the changes require <br />an alteration of its obligations under this Agreement, Contractor and Owner shall seek to agree in writing to terms that reflect Contractor’s <br />assessment. Owner is ultimately responsible for monitoring the condition of the Equipment and ensuring recommendations from Contractor are <br />followed. Contractor’s customer portal (D-Tech) is available for Owner to monitor the Equipment’s condition and Contractor’s recommendations. <br />Owner is responsible for responding promptly to Contractor’s requests to schedule preventative maintenance, otherwise Contractor will not be <br />liable for damage caused by unscheduled maintenance. Owner is responsible for proposing maintenance windows when an outage wo uld not <br />cause major disruption to owner’s operations. In the event Owner does not allow a system to go into maintenance bypass during a major <br />maintenance inspection, failure of equipment is not covered. Damage to any equipment or load loss from UPS support of non-critical loads <br />such as vending machines, motors, heaters, HVAC or any non-computer based equipment not designed to be supported by UPS systems is <br />not covered. <br />E. Recalls In the event of a recall or modification from a manufacturer on a customer’s specified piece of equipment, Contractor is not <br />responsible for ensuring these modifications are performed nor is Contractor responsible for any damages caused by the defect if the customer <br />fails to have the manufacturer remedy the defect. <br />F. Equipment Responsibility Contractor is not responsible for coverage of damaged or failed components in the following circumstances: (1) <br />damage to any equipment caused by a capacitor or fan that Contractor has recommended replacing due to its condition or age (usually 5 years <br />for capacitors and 7 years for fans); (2) damage to any equipment caused by a battery that Contractor has recommended replacing due to its <br />condition or age (usually 4 years for batteries); or (3) damage caused by Equipment continually operating in temperature ranges outside of the <br />tolerance range (68F to 77F degrees), or Equipment exposed briefly to extreme temperatures. While Contractor will exhaust all avenues to <br />repair Equipment despite its age or condition, Owner is responsible for all costs involved in replacement of Equipment that is obsole te and/or <br />deemed unrepairable. If Equipment is past Manufacturer’s End-of-Life and/or is deemed unrepairable, Contractor’s obligations under this <br />Agreement shall cease on that piece of Equipment. <br />3. Contractor’s Responsibility <br />Contractor agrees that it will, by its authorized representatives, inspect and maintain the Equipment in good operating condition by per forming <br />maintenance and inspection services and/or emergency services as specified on such Quote(s), upon receipt of telephonic no tification at its <br />General Offices in Minneapolis. The Quote(s) attached hereto including the additional conditions thereof applicable to the Eq uipment are <br />incorporated herein as part of this Agreement. Additional equipment may be added to this Agreement fo r an additional fee. Additional <br />Equipment will be identified in subsequent Quote(s) to be attached hereto, showing the start date of service coverage and the annual service <br />fee for the Equipment. <br />4. Force Majeure <br />Upon notice to Owner, Contractor may delay delivery of services or goods due to causes beyond Contractor’s reasonable control. Such causes <br />shall include but not be limited to war, terrorism, fire or unusually severe weather. <br />5. Payment <br />This Proposal for Service is contingent upon DC Group performing a Credit Rating check. Services under this Proposal for Serv ice shall not <br />commence until DC Group has performed a Credit Rating check and approved Payment Terms for Owner. Owner’s acceptance of this Proposal <br />for Service includes agreement to the above statements and consent to provide credit and trade references to DC Group. If DC Group is unable <br />to complete a satisfactory Credit Rating check, Owner will be notified and any Proposal for Servic e with Owner may be voided or may require <br />payment in full prior to performing service. <br />In consideration of the services to be performed hereunder, Owner shall pay the sums set forth in the attached Quote(s) speci fying the package <br />agreed upon. In addition to the sums stated on the attached Quote(s), Owner shall pay with the charges hereinabove set forth, all applicable <br />State, Local and Municipal taxes levied upon the charges by any taxing authority having jurisdiction thereof, or supply Contr actor satisfactory <br />proof of exemption there from. All payments are due net 30 days in full, and any payment not made when due shall be subject t o an interest <br />charge of 1.5% per month or fraction thereof, or the maximum rate permitted by law, whichever is less. If any p ayment is not made when due, <br />Contractor reserves the right to refuse to provide any further service until its receipt of the payment and applicable intere st. <br />DocuSign Envelope ID: 90A4748C-1125-4A3F-8439-DE8F1CA99985