Orange County NC Website
OLM Environmental, LLC PHONE: (919) 212-3019 <br />2317 LOCKWOOD FOLLY LANE; RALEIGH, NC 27610 CELLPHONE: (919) 931-0629 <br />March 15, 2022 <br />Atlas Engineering, Inc. <br />551-A Pylon Drive <br />Raleigh, North Carolina 27606 <br />Attention: Rob Tatum, RRC <br />Senior Designer <br />Subject: Revised Report Summarizing Bulk Sampling Analytical Results for Roof Materials <br /> to Determine Asbestos Content <br />Orange County Whitted Building Roof System Replacement Project <br />300 West Tryon Street <br />Hillsborough, North Carolina 27278 <br />Project No.: OLME-2022-02 <br />Dear Mr. Tatum: <br />OLM Environmental, LLC (OLME) is pleased to present this report summarizing the analytical results for <br />the bulk sampling of suspect materials obtained from the existing roof systems to determine asbestos content. <br />We understand that the current roof system(s) on the above-mentioned facility are planned for replacement. <br />Atlas Engineering, Inc. (Atlas) located in Raleigh, North Carolina has been contracted by the Orange County <br />to design and manage each replacement project. Atlas contracted OLME to assess the roof for suspect <br />materials known to contain asbestos; to develop a sampling strategy; and report the analysis of the bulk <br />sampling performed throughout the roof system. <br />The roof’s assessment and bulk sample collection was performed by our inspectors on January 19, 2022. <br />OLME representative, Oral L. McGirt, discussed and coordinated the sampling strategy with Atlas <br />representatives, Rob Tatum, Tim Ford and Mark Iakovenko. Mr. McGirt and Mr. Tatum identified and agreed <br />on the type of materials to be sampled. This report presents known survey procedures, survey results and <br />recommendations and provides general information, such as the existence, general location, condition and <br />type of identified asbestos-containing materials (ACM). <br />SURVEY PROCEDURES <br />Mr. McGirt conducted and discussed the visual assessment of the existing roof system(s) along with Mr. <br />Tatum. At the completion of the roof assessment, a sampling strategy was determined; and bulk samples <br />were obtained. Suspect materials were grouped based on material homogeneity. A homogeneous area is an <br />DocuSign Envelope ID: 89558C18-938A-4BFF-B14A-A2214E8AA5DD