Orange County NC Website
<br />230800.1- GENERAL MECHANICAL AND ELECTRICAL REQUIREMENTS <br /> <br />Project Manual for Whitted Building Roof Replacement <br />Orange County, Hillsborough, NC <br />Prepared by Atlas Engineering, Inc., 551-A Pylon Drive – Raleigh, NC 27606 <br />May 2022 <br />SECTION 230000 <br /> <br />MECHANICAL AND ELECTRICAL REQUIREMENTS <br /> <br />PART 1 GENERAL <br /> <br />1.01 WORK INCLUDED <br /> <br />A. Provide labor, materials, equipment and supervision necessary for inspection, disconnection, <br />relocation, reinstallation, reconnection, and recharging of existing rooftop equipment and associated <br />extensions of and/or modifications to existing mechanical connections, electrical connections, <br />ductwork, control wiring, or pneumatic lines. This work is associated with raising the existing units <br />and is only required as needed to maintain units in operational condition after roof replacement. <br /> <br />B. Provide labor, materials, equipment and supervision necessary for inspection of, repairs to, and any <br />associated extensions of and/or modifications to existing electrical, control, and/or other wiring. <br /> <br />C. Provide materials, equipment and supervision necessary for other miscellaneous electrical and/or <br />mechanical work not specifically listed but required for complete and proper installation of the work <br />as specified herein or shown on the drawings. <br /> <br />1.02 QUALITY ASSURANCE <br /> <br />A. Perform mechanical and electrical work in accordance with the latest adopted editions of the National <br />Mechanical Code, the National Electrical Code, EPA, NFPA, and other applicable local regulations. <br /> <br />B. In addition to compliance with laws and regulations stated in Paragraph 1.02A, work shall conform to <br />applicable standards of UL, ASME, ANSI, and other authorities or agencies to which specific reference <br />is made by specifications and/or manufacturer’s installation instructions. <br /> <br />C. The Contractor shall secure and pay for all necessary permits, fees and inspections and prepare all <br />drawings required by applicable state and local codes. <br /> <br />D. Check all equipment to ensure it is in proper working order prior to construction. Notify the <br />Designer/Owner of any equipment that is damaged or is not working properly. Any equipment found <br />to be damaged or not in working order after the beginning of construction will be repaired/replaced by <br />the Contractor at no cost to the Owner. <br /> <br />1.03 WARRANTY <br /> <br />A. If replacement of an existing mechanical unit(s) or electrical component(s) becomes necessary, due to <br />damage during construction activities, provide the equipment or component manufacturer’s standard <br />product warranty in addition to the Contractor’s five-year warranty against defects of materials and <br />workmanship beginning with date of substantial completion at no cost to the Owner. <br /> <br /> <br /> <br /> <br />DocuSign Envelope ID: 89558C18-938A-4BFF-B14A-A2214E8AA5DD