Orange County NC Website
<br />077200.5 – ROOF ACCESSORIES <br /> <br />Project Manual for Whitted Building Roof Replacement <br />Orange County, Hillsborough, NC <br />Prepared by Atlas Engineering, Inc., 551-A Pylon Drive – Raleigh, NC 27606 <br />May 2022 <br /> <br />E. Set wall supports in a bed of sealant. <br /> <br />FIELD QUALITY CONTROL <br /> <br />A. The Contractor is responsible for initiating and maintaining daily execution of a quality <br />control program that will include, but is not limited to supervision by the job foreman or <br />supervisor during measurements for fabrication, substrate preparation, and installation of <br />accessory components. <br /> <br />B. Correct defects and irregularities as directed by Designer or Owner’s representative. <br />C. Contractor shall plan sequence of work to prevent damages to existing materials to remain <br />interior components, or new replacement roof system. <br />D. Significant abrasions, scratches, scrapes, etc. in finished metal surfaces may result in <br />rejection by the Designer, and require removal and replacement. <br /> <br />3.03 JOB AND WEATHER CONDITIONS <br /> <br />A. Suspend all application and installation activities during inclement weather. <br /> <br />B. Protect adjacent building surfaces against damage. <br /> <br />C. Remove debris from roof and site on a daily basis and dispose at an approved disposal site. <br /> <br />D. Limit traffic over completed roof surfaces and provide protection from equipment, worker <br />traffic, and materials during installation. <br /> <br /> <br />END OF SECTION 077200 <br /> <br />DocuSign Envelope ID: 89558C18-938A-4BFF-B14A-A2214E8AA5DD