Browse
Search
2022-286-E-AMS-Owens Roofing-Whitted complex roof replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-286-E-AMS-Owens Roofing-Whitted complex roof replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2022 1:40:40 PM
Creation date
7/19/2022 1:37:26 PM
Metadata
Fields
Template:
Contract
Date
7/6/2022
Contract Starting Date
7/6/2022
Contract Ending Date
7/19/2022
Contract Document Type
Contract
Amount
$896,317.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />077200.5 – ROOF ACCESSORIES <br /> <br />Project Manual for Whitted Building Roof Replacement <br />Orange County, Hillsborough, NC <br />Prepared by Atlas Engineering, Inc., 551-A Pylon Drive – Raleigh, NC 27606 <br />May 2022 <br /> <br />E. Set wall supports in a bed of sealant. <br /> <br />FIELD QUALITY CONTROL <br /> <br />A. The Contractor is responsible for initiating and maintaining daily execution of a quality <br />control program that will include, but is not limited to supervision by the job foreman or <br />supervisor during measurements for fabrication, substrate preparation, and installation of <br />accessory components. <br /> <br />B. Correct defects and irregularities as directed by Designer or Owner’s representative. <br />C. Contractor shall plan sequence of work to prevent damages to existing materials to remain <br />interior components, or new replacement roof system. <br />D. Significant abrasions, scratches, scrapes, etc. in finished metal surfaces may result in <br />rejection by the Designer, and require removal and replacement. <br /> <br />3.03 JOB AND WEATHER CONDITIONS <br /> <br />A. Suspend all application and installation activities during inclement weather. <br /> <br />B. Protect adjacent building surfaces against damage. <br /> <br />C. Remove debris from roof and site on a daily basis and dispose at an approved disposal site. <br /> <br />D. Limit traffic over completed roof surfaces and provide protection from equipment, worker <br />traffic, and materials during installation. <br /> <br /> <br />END OF SECTION 077200 <br /> <br />DocuSign Envelope ID: 89558C18-938A-4BFF-B14A-A2214E8AA5DD
The URL can be used to link to this page
Your browser does not support the video tag.