Browse
Search
2022-286-E-AMS-Owens Roofing-Whitted complex roof replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-286-E-AMS-Owens Roofing-Whitted complex roof replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2022 1:40:40 PM
Creation date
7/19/2022 1:37:26 PM
Metadata
Fields
Template:
Contract
Date
7/6/2022
Contract Starting Date
7/6/2022
Contract Ending Date
7/19/2022
Contract Document Type
Contract
Amount
$896,317.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />077200.4 – ROOF ACCESSORIES <br /> <br />Project Manual for Whitted Building Roof Replacement <br />Orange County, Hillsborough, NC <br />Prepared by Atlas Engineering, Inc., 551-A Pylon Drive – Raleigh, NC 27606 <br />May 2022 <br /> <br />3.02 ROOF HATCH SAFETY RAIL <br /> <br />A. Measure curb to ensure proper fitting. <br /> <br />B. Set curb faming gasket around roof opening and tighten to fit opening. <br /> <br />C. Install the corner posts and bolt to frame. <br /> <br />D. Install cross rails into clamps and level adjust. <br /> <br />E. Follow the manufacturer’s instructions and recommendations. <br /> <br />3.03 CEILING PANEL AND CEILING OPENING FRAMING <br /> <br />A. Location to be coordinated on site and coordinated with installation of a new roof hatch. <br /> <br />B. Remove 4’ by 4’ grid of ceiling tile and modify ceiling tile hangers. Install new ceiling tile <br />hangers and ceiling tiles as necessary. <br /> <br />C. Remove the existing hard ceiling and attic floor joist structure to accommodate the <br />size/installation of the new ceiling access panel. <br /> <br />D. Frame the hard ceiling opening with wood/metal framing/blocking per the design drawings and <br />section 061140. <br /> <br />E. Install new ceiling access panel in strict accordance with the manufacturer installation <br />instructions. <br /> <br />F. Install metal stud framing and drywall to create a chase from the existing drop ceiling level to the <br />underside of the attic floor/hard ceiling level. Install drywall layers over the metal stud framing to <br />maintain existing fire-ratings. <br /> <br />3.04 LADDER <br /> <br />A. Shop drawings shall be submitted to the Owner and the Designer for approval. The ladder shall be <br />constructed and/or coated in such a manner as to resist weathering. All fasteners attaching the <br />ladder to the structure shall have neoprene/EPDM washers. <br /> <br />B. Take field measurements prior to preparation of shop drawings and fabrications. Do not delay job; <br />allow for cutting and fitting if field measurement is not practical. <br /> <br />C. Form work true to line with sharp angles and edges. Comply with AWS standards for procedures <br />of manual shielded metal arc welding, appearance and quality of welds made, and methods used in <br />correcting welding work. Weld continuously, grind flush and make smooth on exposed surfaces. <br /> <br />D. Install work plumb and level with hairline joints and grind welds flush. <br /> <br />DocuSign Envelope ID: 89558C18-938A-4BFF-B14A-A2214E8AA5DD
The URL can be used to link to this page
Your browser does not support the video tag.