Browse
Search
2022-286-E-AMS-Owens Roofing-Whitted complex roof replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-286-E-AMS-Owens Roofing-Whitted complex roof replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2022 1:40:40 PM
Creation date
7/19/2022 1:37:26 PM
Metadata
Fields
Template:
Contract
Date
7/6/2022
Contract Starting Date
7/6/2022
Contract Ending Date
7/19/2022
Contract Document Type
Contract
Amount
$896,317.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />076200.1 – FLASHING AND SHEET METAL <br /> <br />Project Manual for Whitted Building Roof Replacement <br />Orange County, Hillsborough, NC <br />Prepared by Atlas Engineering, Inc., 551-A Pylon Drive – Raleigh, NC 27606 <br />May 2022 <br /> <br />SECTION 076200 <br /> <br />SHEET METAL FLASHING AND TRIM <br /> <br /> <br />PART 1 GENERAL <br /> <br />1.01 WORK INCLUDED <br /> <br />A. Provide all labor, materials, equipment and supervision necessary for fabrication and installation of <br />metal flashing, coping assemblies, counterflashings, trim, and accessories, as specified herein and as <br />required by detail drawings. <br /> <br />B. Coordinate work of this section with work of Sections 024110, 061140, and 075400. <br /> <br />1.02 QUALITY ASSURANCE <br />A. Qualifications of Manufacturer: Products used in the work of this section shall be produced by <br />manufacturers regularly engaged in the manufacture of similar items and with a history of <br />successful production acceptable to the Owner. <br /> <br />B. Qualifications of Contractor: Use adequate number of skilled workmen who are thoroughly trained <br />and experienced in the necessary crafts and are completely familiar with the specified requirements <br />and the methods needed for the proper performance of the work in this section. In acceptance or <br />rejection of the work of this section, the Owner shall make no allowance for lack of skill on the <br />part of the workmen. <br /> <br />C. Comply with pertinent codes and regulations including recommendations contained in the most recent <br />edition of the "Architectural Sheet Metal Manual," published by the Sheet Metal and Air-Conditioning <br />Contractors National Association (SMACNA). <br /> <br />D. When sheetmetal flashings form an integral part of the weather tightness of a detail, comply with roof <br />system manufacturer requirements. Where manufacturer recommendations differ from SMACNA or <br />the design specifications and drawings, the more stringent requirement will take precedence unless <br />otherwise agreed upon with the Engineer. <br /> <br />1.03 SUBMITTALS <br /> <br />A. Submit product data, installation instructions, sample warranties, and SDS sheets for sheetmetal <br />components to be installed. <br /> <br />B. Submit shop drawings clearly detailing shaping, jointing, length of sections, fastener type and <br />spacing, gauge of materials, and installation details. This information may be incorporated into the <br />overall roof system shop drawings. <br /> <br /> <br /> <br />DocuSign Envelope ID: 89558C18-938A-4BFF-B14A-A2214E8AA5DD
The URL can be used to link to this page
Your browser does not support the video tag.