Browse
Search
2022-286-E-AMS-Owens Roofing-Whitted complex roof replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-286-E-AMS-Owens Roofing-Whitted complex roof replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2022 1:40:40 PM
Creation date
7/19/2022 1:37:26 PM
Metadata
Fields
Template:
Contract
Date
7/6/2022
Contract Starting Date
7/6/2022
Contract Ending Date
7/19/2022
Contract Document Type
Contract
Amount
$896,317.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />075400.16 – THERMOPLASTIC SINGLE-PLY ROOF SYSTEM <br /> <br />Project Manual for Whitted Building Roof Replacement <br />Orange County, Hillsborough, NC <br />Prepared by Atlas Engineering, Inc., 551-A Pylon Drive – Raleigh, NC 27606 <br />May 2022 <br /> <br />provided by the Contractor is not satisfactory to the Owner, and an agreement cannot be promptly <br />reached, the Owner reserves the right to perform such repairs or replacements and shall deduct the <br />cost of repairs from the Contract Sum. <br /> <br />F. The Contractor may, at their option, provide after hours protection of interior materials (computers, <br />books, etc.) at areas of specific concern or liability. Installation of protection such as plastic sheets, <br />etc. shall be performed by the Contractor’s personnel with the advance approval of Facilities <br />Management. Installations shall not damage permanent materials or finishes. Contractor shall be <br />responsible for removal of the temporary protection for normal use of the interior contents during <br />standard building hours. <br /> <br />3.11 JOB COMPLETION <br /> <br />A. Inspect completed roofing and correct defects to meet the specification requirements. <br /> <br />B. Roof system manufacturer’s representative shall inspect the completed roofing system and notify <br />the Contractor of any defects in the application. <br /> <br />C. Clean up debris, excess materials and equipment, and remove from site. <br /> <br />D. Clean drips or spills of adhesive or primers. Provide an overall surface cleaning of the roof <br />membrane and flashings using detergents or cleaners as approved/recommended by the roof system <br />manufacturer. <br /> <br />END OF SECTION 075400 <br /> <br />DocuSign Envelope ID: 89558C18-938A-4BFF-B14A-A2214E8AA5DD
The URL can be used to link to this page
Your browser does not support the video tag.