Browse
Search
2022-286-E-AMS-Owens Roofing-Whitted complex roof replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-286-E-AMS-Owens Roofing-Whitted complex roof replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2022 1:40:40 PM
Creation date
7/19/2022 1:37:26 PM
Metadata
Fields
Template:
Contract
Date
7/6/2022
Contract Starting Date
7/6/2022
Contract Ending Date
7/19/2022
Contract Document Type
Contract
Amount
$896,317.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 017700.1 – PROJECT CLOSEOUT <br /> <br />Project Manual for Whitted Building Roof Replacement <br />Orange County, Hillsborough, NC <br />Prepared by Atlas Engineering, Inc., 551-A Pylon Drive – Raleigh, NC 27606 <br />May 2022 <br />SECTION 017700 <br /> <br />PROJECT CLOSE-OUT <br /> <br />PART 1 GENERAL <br /> <br />1.01 SUMMARY <br /> <br />A. When Contractor considers Work to have reached completion, submit written certification that <br />Contract Documents have been reviewed, the Contractor has inspected Work, and that Work is <br />complete in accordance with Contract Documents and ready for Engineer's inspection. For the purpose <br />of requesting a pre-final inspection, “completion” is defined as the performance of all of the work items <br />listed in the Project Manual and as required for proper installation of the roof system. <br /> <br />B. Designer shall make one pre-final inspection during which a list of incomplete items, or items requiring <br />repair (punchlist) will be compiled. Upon completion of punchlist items, the Contractor submit in <br />writing that completion of the punchlist items has been confirmed by the Contractor and is ready for <br />the Designer’s final inspection. The Designer will perform the Final Inspection to confirm completion <br />of outstanding punchlist items. <br /> <br />C. If the Contractor fails to complete contract on time, the Owner reserves the right to assess liquidated <br />damages in accordance with the Supplementary Conditions of the Contract. <br /> <br />D. If the Contractor fails to complete contract on time, additional restrictions from the Owner to work <br />schedule, noise, storage, staging, and other site and building restrictions may apply. <br /> <br />E. In addition to post-job submittals required by Section 013300, provide any submittals required by <br />governing authorities, and submit a final statement of accounting giving total adjusted Contract Sum, <br />previous payments, and sum remaining due. <br /> <br />F. Designer will issue a final Change Order reflecting approved adjustments to Contract Sum not <br />previously made by Change Order. <br /> <br />1.02 FINAL CLEANING <br /> <br />A. Execute final cleaning of the roof membrane surface and all components prior to performance of the <br />Pre-Final inspection. Execute final cleaning of the site and punchlist repair areas prior to requesting <br />the final inspection. <br /> <br />B. Clean interior and exterior surfaces exposed to view; remove temporary labels, stains and foreign <br />substances. <br /> <br />C. Clean site: sweep paved areas, rake clean other surfaces affected by the work, storage or access. <br />Contractor may be required to re-sod areas of grass that are killed/damaged as a result of construction <br />activity if required by the Owner to return site conditions to their original condition. <br /> <br />DocuSign Envelope ID: 89558C18-938A-4BFF-B14A-A2214E8AA5DD
The URL can be used to link to this page
Your browser does not support the video tag.