Browse
Search
2022-286-E-AMS-Owens Roofing-Whitted complex roof replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-286-E-AMS-Owens Roofing-Whitted complex roof replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2022 1:40:40 PM
Creation date
7/19/2022 1:37:26 PM
Metadata
Fields
Template:
Contract
Date
7/6/2022
Contract Starting Date
7/6/2022
Contract Ending Date
7/19/2022
Contract Document Type
Contract
Amount
$896,317.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 016000.2 – MATERIALS AND EQUIPMENT <br /> <br />Project Manual for Whitted Building Roof Replacement <br />Orange County, Hillsborough, NC <br />Prepared by Atlas Engineering, Inc., 551-A Pylon Drive – Raleigh, NC 27606 <br />May 2022 <br />I. No payment by the Owner will be made for any material not physically located on the site unless <br />the storage of such material can be verified by the Designer and is marked specifically for the <br />project use and scheduled for installation within 30 days of payment request. <br /> <br />1.03 SUBSTITUTIONS AND PRODUCT OPTIONS <br /> <br />A. Products Specified by Reference Standards or by Description Only: Provide a product meeting <br />those standards. The Owner and Engineer reserve the right to require confirmation by the roof <br />manufacturer that their system/products intended for use meet the requirements of the <br />specifications prior to award of the contract. Failure of the contractor to provide requested <br />confirmation may result in disqualification of their bid. <br /> <br />B. Products Specified by Naming Several Manufacturers: Provide a product of named manufacturers <br />meeting specifications: Requests for product substitutions must be made in writing for any <br />manufacturer not specifically named in accordance with the following requirements in paragraphs <br />1.03C, D, E, F, and G. When a minimum of three approved manufacturers/products are listed, <br />the Engineer reserves the right to not accept any requests for manufacturer/system <br />substitutions. <br /> <br />C. If the Engineer will allow requests for substitution of the roof membrane/system and manufacturer <br />from those listed in the applicable section of these specifications, requests must be submitted no <br />less than ten (10) days prior to the bid date. Requests must be made by the Contractor, requests <br />from suppliers or manufacturers will not be reviewed. <br /> <br />D. Each written request for a substitution shall be submitted with complete data substantiating <br />compliance of proposed substitution with the technical specifications and drawings. <br /> <br />E. The request shall constitute that the Contractor: <br /> <br />1. Has investigated the proposed product and determined that it meets or exceeds, in all <br />respects, specified product and provided documentation to Engineer. <br />2. Will provide the same warranty as the specified product. <br />3. Will coordinate installation and make any other change that may be required for work to <br />be complete with substituted item. <br />4. Waives claims for additional costs that may subsequently become apparent due to use of <br />substituted item. <br /> <br />F. Substitutions will not be considered when they are included without identification as a substitution <br />or implied on shop drawings or product data submittals without separate written request, or when <br />acceptance will require substantial revision of technical specifications. <br /> <br />G. The Designer will determine acceptability of proposed substitution, and will notify the Contractor <br />of acceptance or rejection in writing within a reasonable time. <br /> <br />PART 2 PRODUCTS – NOT USED <br /> <br />PART 3 EXECUTION – NOT USED <br /> <br /> <br />END OF SECTION 016000 <br />DocuSign Envelope ID: 89558C18-938A-4BFF-B14A-A2214E8AA5DD
The URL can be used to link to this page
Your browser does not support the video tag.