Browse
Search
2022-286-E-AMS-Owens Roofing-Whitted complex roof replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-286-E-AMS-Owens Roofing-Whitted complex roof replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2022 1:40:40 PM
Creation date
7/19/2022 1:37:26 PM
Metadata
Fields
Template:
Contract
Date
7/6/2022
Contract Starting Date
7/6/2022
Contract Ending Date
7/19/2022
Contract Document Type
Contract
Amount
$896,317.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />015000.4 - CONSTRUCTION FACILITIES <br /> <br />Project Manual for Whitted Building Roof Replacement <br />Orange County, Hillsborough, NC <br />Prepared by Atlas Engineering, Inc., 551-A Pylon Drive – Raleigh, NC 27606 <br />May 2022 <br />Alternate fencing must be discussed with and agreed upon by the Owner. Remove evidence of use <br />and leave area and entire limits of site clean upon completion of the project. Restore areas damaged <br />by stored materials to original condition. <br /> <br />B. Contractor shall load materials onto the roof when areas below loading area are unoccupied by <br />building occupants unless otherwise coordinated with the Owner. It is the responsibility of the <br />Contractor to space materials stored on roof such that they do not overload the existing roof deck <br />and structure. Storage of materials on the roof surface shall be limited to those expected to be <br />installed within 5-7 work days unless discussed with and agreed upon by the Owner and Designer. <br /> <br />C. Contractor shall not stockpile removed materials on site. <br /> <br />D. The Contractor is responsible for scheduling delivery of materials to the site to allow for continued <br />work and taking into consideration the size and location of storage area. Contractor shall obtain <br />and pay for use of additional storage or work areas if needed for operations under this Contract. <br /> <br />E. No Contractor sign or advertisement shall be allowed to be displayed without the Owner and <br />Designer’s approval. <br /> <br />PART 2 PRODUCTS – NOT USED <br /> <br />PART 3 EXECUTION – NOT USED <br /> <br />END OF SECTION 015000 <br />DocuSign Envelope ID: 89558C18-938A-4BFF-B14A-A2214E8AA5DD
The URL can be used to link to this page
Your browser does not support the video tag.