Browse
Search
2022-286-E-AMS-Owens Roofing-Whitted complex roof replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-286-E-AMS-Owens Roofing-Whitted complex roof replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2022 1:40:40 PM
Creation date
7/19/2022 1:37:26 PM
Metadata
Fields
Template:
Contract
Date
7/6/2022
Contract Starting Date
7/6/2022
Contract Ending Date
7/19/2022
Contract Document Type
Contract
Amount
$896,317.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />014000.2 – QUALITY CONTROL <br /> <br />Project Manual for Whitted Building Roof Replacement <br />Orange County, Hillsborough, NC <br />Prepared by Atlas Engineering, Inc., 551-A Pylon Drive – Raleigh, NC 27606 <br />May 2022 <br />E. For the purpose of safety and communication, the Contractor shall have a minimum of one bilingual <br />person on site at all times if any crew member to be present on-site does not speak fluent English. <br />Designated translators must have identification of this role clearly visible while on site. <br /> <br />F. A representative of the contractor must be present on site full time during work performed by their <br />subcontractor and shall be responsible for ensuring that their subcontractor’s following the site and <br />building requirements for this project including site access, work hours, etc. to minimize disruption to <br />the building occupants and public. <br /> <br />1.03 MANUFACTURER’S SERVICES AND INVOLVEMENT <br /> <br />A. The Contractor shall be responsible for providing the design documents to the manufacturer to allow <br />for review and approval regarding design intent and to confirm ability of their system to meet specified <br />requirements and specified system warranty prior to provision of a bid for the project. Failure of a <br />particular roof system to meet the requirements of the specifications, or failure of the manufacturer to <br />provide intent to warranty for the project may result in the requirement for the Contractor to utilize <br />another conforming roof system manufacturer’s products at no additional cost to the Owner. <br /> <br />B. Comply with the manufacturer’s installation instructions, including each step in proper sequence. <br />Should manufacturer’s instructions or detail requirements be less stringent that the Contract <br />Documents, use the more stringent requirements. If the manufacturer’s instructions or detail <br />requirements conflict with the Contract Documents, request clarification from the Engineer before <br />proceeding. <br /> <br />1.04 ENGINEER’S CONSTRUCTION OBSERVATIONS <br /> <br />A. Contractor shall notify Engineer weekly of significant project activities. Contractor must notify <br />Engineer a minimum of 48 hours prior to specific activities for which the Engineer wishes to be <br />present. The applicable activities will be defined by the Engineer during the Pre-Construction <br />Meeting, but may include first day of tear-off and replacement on specific roof areas or installation <br />of specific details, and independent inspections or testing by the manufacturer or other parties. If <br />Contractor fails to notify Engineer to allow for observation, Engineer may request to observe work, <br />including covered work, to confirm conformance with contract documents at no additional cost to <br />the Owner. <br /> <br />B. Contractor shall provide reasonable access, personnel and equipment required by Engineer to observe <br />the Work. <br /> <br />1.05 WARRANTY AND GUARANTEE <br /> <br />A. Provide a Contractor’s Five-Year Warranty for all of the work included in this project. The Contractor <br />shall warrant workmanship, materials, and weathertightness of the roof system against defects due to <br />faulty materials, poor workmanship, or work not installed in conformance with project technical <br />requirements or level of quality as required by the general and supplemental conditions. Warranty must <br />cover repair of distresses that are discovered in the roof system or other installed work whether or not <br />they are actively causing water entry into the system or building. The warranty will extend for a period <br />of sixty (60) months from the date of Final Completion. The provided warranty shall be in addition to <br />and independent from the roof system manufacturer’s warranty. The Contractor shall include language <br />DocuSign Envelope ID: 89558C18-938A-4BFF-B14A-A2214E8AA5DD
The URL can be used to link to this page
Your browser does not support the video tag.