Browse
Search
2022-286-E-AMS-Owens Roofing-Whitted complex roof replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-286-E-AMS-Owens Roofing-Whitted complex roof replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2022 1:40:40 PM
Creation date
7/19/2022 1:37:26 PM
Metadata
Fields
Template:
Contract
Date
7/6/2022
Contract Starting Date
7/6/2022
Contract Ending Date
7/19/2022
Contract Document Type
Contract
Amount
$896,317.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />013300.4 –SUBMITTALS <br /> <br />Project Manual for Whitted Building Roof Replacement <br />Orange County, Hillsborough, NC <br />Prepared by Atlas Engineering, Inc., 551-A Pylon Drive – Raleigh, NC 27606 <br />May 2022 <br />3.02 TIMING OF SUBMITTALS <br /> <br />A. Make submittals far enough in advance of scheduled dates of Notice to Proceed, and the start of work <br />or installation of specific products to provide time required for review by the Engineer, for securing <br />necessary approvals, for possible revisions and resubmittals, and for placing order and securing <br />delivery of materials. <br /> <br />B. In scheduling, allow a minimum of ten (10) working days from date of Engineer’s receipt of the <br />submittal for his review. <br /> <br />C. Contractor accepts responsibility for delays resulting from incomplete or late submittal packages. <br /> <br />D. Work completed without approved submittals may be subject to rejection. <br /> <br />3.03 DESIGNER'S REVIEW <br /> <br />A. Partial submittals may be rejected for non-compliance with the Contract Documents. <br /> <br />B. Review by Designer does not relieve Contractor from responsibility of conforming to the technical <br />specifications and drawings or for errors which may exist in the submitted data. <br /> <br />C. Revisions: <br /> 1. Make revisions when required by Designer and resubmit for review. <br />2. If the Contractor considers any required revision to be a change, he shall so notify the Designer <br />as provided for in the article for "Changes in the Work" of the General Conditions. <br /> 3. Make only those revisions directed or approved by the Designer. <br /> <br />D. The Engineer will provide an initial review and up to two subsequent reviews of each required <br />submittal. Submittal reviews in excess of this due to incomplete submittals or failure to address review <br />comments may result in additional cost to the Owner. The Owner reserves the right to require <br />reimbursement of this additional cost by the Contractor. <br /> <br />3.04 CLAIMS FOR EXTRA COST: No claim for extra cost shall be approved solely based on work shown <br />on shop drawings unless such claim is made on the Contractor's letter of transmittal accompanying the <br />shop drawings and is approved by the Owner in writing. <br /> <br /> <br />END OF SECTION 013300 <br /> <br /> <br /> <br />DocuSign Envelope ID: 89558C18-938A-4BFF-B14A-A2214E8AA5DD
The URL can be used to link to this page
Your browser does not support the video tag.