Browse
Search
2022-286-E-AMS-Owens Roofing-Whitted complex roof replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-286-E-AMS-Owens Roofing-Whitted complex roof replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2022 1:40:40 PM
Creation date
7/19/2022 1:37:26 PM
Metadata
Fields
Template:
Contract
Date
7/6/2022
Contract Starting Date
7/6/2022
Contract Ending Date
7/19/2022
Contract Document Type
Contract
Amount
$896,317.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 012100.1 – BASE BID ALLOWANCES (ESTIMATED QUANTITIES) <br /> <br />Project Manual for Whitted Building Roof Replacement <br />Orange County, Hillsborough, NC <br />Prepared by Atlas Engineering, Inc., 551-A Pylon Drive – Raleigh, NC 27606 <br /> May 2022 <br />SECTION 012100 <br /> <br />BASE BID ALLOWANCES (ESTIMATED QUANTITIES) <br /> <br />PART 1 GENERAL <br /> 1.01 SUMMARY <br /> <br />A. This Section includes requirements governing estimated quantities of work to be included within the <br />Base Bid cost and the associated unit prices requested to aid in reconciliation between quantities <br />estimated and actual work performed. Refer to Section 010100 for additional information regarding <br />Base Bid scope of work. <br /> <br />B. Refer to specification sections 024110, 061140, and 075400 for technical requirements regarding base <br />bid allowance (estimated quantity) work. <br /> <br />1.02 SUBMITTALS <br /> <br />A. Provide submittals for products to be repaired, removed, and or installed as a part of the work in <br />accordance with Section 013300 and the technical specification sections in which they are specified. <br /> <br />1.03 ESTIMATED QUANTITY WORK <br /> <br />A. Estimated quantities are provided below for replacement of materials discovered to be deteriorated, <br />damaged, missing, and/or installation of additional work that is not specifically designated in the <br />specifications, but may become necessary. The cost to perform the estimated quantity of each work <br />item listed below shall be included within the Base Bid. <br /> <br /> Unit Price Work Item Estimated Quantity <br /> 1. Metal Deck Restoration per Section 024110 200 sq.ft. <br /> 2. Metal Deck Replacement per Section 024110 50 sq.ft. <br />3. Metal Deck Repair per Section 024110 100 sq.ft. <br />4. Wood Deck Replacement per Section 061140 300 sq.ft. <br />5. Wood Deck Repair per Section 061140 50 sq.ft. <br />6. Wood Blocking Replacement per Section 061140 100 bd.ft. <br />7. Plywood Replacement per Section 061140 100 sq.ft. <br />8. Additional Walk Tread Installation per Section 075400 200 ln. ft. <br /> <br />1.04 UNIT PRICES FOR ESTIMATED QUANTITY WORK ITEMS <br /> <br />A. A unit price for each of the estimated quantity work items listed above is requested on the Form of <br />Proposal. Unit prices provided by the Contractor will be used for the purpose of adding or deducting <br />from the Contract Sum by Change Order in the event that the actual performed amounts of each <br />estimated quantity work item listed in Paragraph 1.03A are more than, or less than, the estimated <br />quantity included in the Base Bid. <br /> <br />B. The unit prices provided on the Form of Proposal shall include all costs associated with the work <br />including, but not limited to, removal of materials to be replaced, preparation of substrates and <br />DocuSign Envelope ID: 89558C18-938A-4BFF-B14A-A2214E8AA5DD
The URL can be used to link to this page
Your browser does not support the video tag.