Browse
Search
2022-286-E-AMS-Owens Roofing-Whitted complex roof replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-286-E-AMS-Owens Roofing-Whitted complex roof replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2022 1:40:40 PM
Creation date
7/19/2022 1:37:26 PM
Metadata
Fields
Template:
Contract
Date
7/6/2022
Contract Starting Date
7/6/2022
Contract Ending Date
7/19/2022
Contract Document Type
Contract
Amount
$896,317.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />010100.7 –SUMMARY OF WORK <br /> <br />Project Manual for Whitted Building Roof Replacement <br />Orange County, Hillsborough, NC <br />Prepared by Atlas Engineering, Inc., 551-A Pylon Drive – Raleigh, NC 27606 <br />May 2022 <br />to the building and adjacent buildings through the duration of the project. Contractor shall schedule <br />and coordinate work with the designated points of contact at Orange County Asset Management <br />and within the building. <br /> <br />B. For the purpose of bidding, acceptable work hours shall be Monday-Friday between 6:00 a.m. and <br />8:00 p.m. The Orange County Project Manager must be notified in advance of work on weekends <br />or outside of the hours listed above to allow for coordination and approval. This anticipated <br />schedule is provided for general planning and does not eliminate the requirement for the Contractor <br />to coordinate with the Owner to limit disruption to potential interior functions/use. <br /> <br />C. The Contractor must follow all requirements of Orange County including, but not limited to, use <br />of staging and storage areas as designated by the project documents, entrance to the site by workers <br />and delivery vehicles, coordination to avoid significant noise disruption, and coordination of <br />construction scheduling around the events of the building. Contractor shall not perform work if <br />requested by the Owner due to special events at the building. Contractor shall receive additional <br />contract time for time not permitted to work, but shall not receive additional compensation. <br /> <br />D. Do not permanently block ingress and egress from the building. Maintain access that does not <br />interfere with the Owner’s vehicular or pedestrian traffic, unless coordinated with the Owner. <br />Where vehicular or pedestrian traffic will be rerouted or temporarily blocked, provide protective <br />fencing and signage to safely redirect traffic as needed. Provide either covered walkways to <br />maintain safe access at entrance/exits from the building or utilized a spotter on the ground where <br />overhead work may occur. <br /> <br />E. Utilities are to remain undisturbed and in continuous operation, or provide alternate or temporary <br />services acceptable to the Owner. Terminate no utility even for a short period without the prior <br />approval from the Owner. The Contractor is responsible for the location and protection of existing <br />utilities from damage due to construction. Repairs required due to damages to, or outage of existing <br />utilities must be immediately coordinated and paid for by the contractor. Where requested by the <br />Owner, the Contractor must maintain a minimum 8’ clearance from specific equipment or utilities <br />that may require Owner access. <br /> <br />F. Parking and access to the site must be coordinated with the Owner’s representative. Designated <br />limits for delivery trucks and other parking associated with the project will be defined at the pre- <br />construction conference. <br /> G. Contractor shall provide a superintendent, foreman, or other representative from the Contractor that <br />is in a supervisory position and fluent in English, who will be on the site anytime that work is in <br />progress. If workers installing the roof are under subcontract and are not direct employees of the <br />contractor, a representative or personnel in a supervisory position (Superintendent) directly <br />employed by the Prime Contractor must be present full time anytime work is occurring on site. <br /> 1.03 PERMITS <br /> A. The Contractor shall apply for, secure and pay for all permits, governmental fees, inspections and <br />licenses necessary for the proper execution and completion of the Work, which are applicable at <br />the time that Bids are received. Contractor shall provide evidence of acceptance of work by <br />submitting inspection forms from appropriate agencies indicating acceptance of work. <br /> <br /> <br /> <br />DocuSign Envelope ID: 89558C18-938A-4BFF-B14A-A2214E8AA5DD