Browse
Search
2022-286-E-AMS-Owens Roofing-Whitted complex roof replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-286-E-AMS-Owens Roofing-Whitted complex roof replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2022 1:40:40 PM
Creation date
7/19/2022 1:37:26 PM
Metadata
Fields
Template:
Contract
Date
7/6/2022
Contract Starting Date
7/6/2022
Contract Ending Date
7/19/2022
Contract Document Type
Contract
Amount
$896,317.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />010100.6 –SUMMARY OF WORK <br /> <br />Project Manual for Whitted Building Roof Replacement <br />Orange County, Hillsborough, NC <br />Prepared by Atlas Engineering, Inc., 551-A Pylon Drive – Raleigh, NC 27606 <br />May 2022 <br />29. Replace the passive vents on Roof Area B where shown on the design drawings (Alternate <br />Bid 1). Passive vents are to be copper and match the profile of the existing vents. <br /> <br />30. Replace the copper chimney caps on Roof Areas A and B (Alternate Bid 2). Chimney caps <br />are to match existing. <br /> <br />31. Provide and install overhead protection at the entrance/exit locations shown on the <br />drawing. <br /> <br />32. Provide and install other accessory or incidental components, or modify other roof <br />features/items, not specifically listed or shown on drawings, but required for the complete <br />and proper installation of the new roof system. <br /> <br />Note: <br />- Provide construction fencing installed around the perimeter of the project staging and storage <br />limits as defined on the site plan. The fence shall be constructed of heavy-duty chain link <br />materials, have a minimum height of six feet and shall have a continuous top tubular rail. The <br />fencing must use non-penetrating posts set in weighted bases. Swing gates shall be included <br />at every access to the enclosed area. When the project is complete, fencing must be removed <br />and ground contours restored to original condition. <br />- Maintain access to the loading dock and on site dumpsters and coordinate deliveries with <br />Orange County. <br />- A fire watch is required for all hot work (including heat welding of seams). <br />- Provide overhead protection for the generator and electrical panel within staging area. <br />- Provide a COVID-19 plan for review and approval prior to beginning work. <br />- A hot work permit will be required and the contractor must follow all permit requirements. <br />- The workers may not have contact with the building occupants. Cell phones or 2-way radios <br />are to be used to communicate from the roof to the staging area/ground. <br />- No offensive decals/logos are to be worn on clothing or shown on vehicles. <br />- The use of tobacco products is not allowed on the campus. <br />- A minimum of three site visits and a final inspection are required by the roof system <br />manufacturer. Notify Designer and Owner a minimum of 48 hours before manufacturer’s visit. <br />- Contractor shall provide a foreman or a representative from the Contractor that is in a <br />supervisory position that is familiar with the installation of the new roof system and who will <br />be on the site anytime that work by the Contractor or one of his Subcontractors is in progress. <br />The Contractor must provide a representative that is fluent in English on-site at all times when <br />work is in progress to ensure that the Owner and Designer can communicate with the crew <br />members as needed during construction. <br /> <br />B. The technical specifications and drawings provided are for communicating design intent. It is the <br />responsibility of the Contractor to examine the technical specifications and drawings, and the site, <br />and become familiar with and verify the existing conditions, specified design intent, and other <br />conditions necessary for an accurate proposal and execution of the work. Any discrepancies <br />discovered should be brought to the attention of the Designer for clarification or correction. <br /> <br />1.02 COORDINATION AND CONTRACTOR USE OF PREMISES <br /> A. The Owner will occupy the premises during the period of construction for the conduct of normal <br />operations. Limit the use of the premises for construction operations, to allow for Owner occupancy <br />DocuSign Envelope ID: 89558C18-938A-4BFF-B14A-A2214E8AA5DD