Browse
Search
2022-283-E-AMS-The Arts Center-Installation of bike rack and e-bike and e-vehicle charging station
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-283-E-AMS-The Arts Center-Installation of bike rack and e-bike and e-vehicle charging station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2022 2:10:40 PM
Creation date
7/18/2022 2:09:08 PM
Metadata
Fields
Template:
Contract
Date
7/6/2022
Contract Starting Date
7/6/2022
Contract Ending Date
7/18/2022
Contract Document Type
Contract
Amount
$17,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21 <br />The following is a rank-order summary table of the combined project scoring and recommendations for the <br />submitted project. A full table showing the scores for this project on each of the 7 scoring elements is included <br />in the Appendix. <br />Total <br />Project Applicant <br />Funding Recommended Score Rank <br />Requested Funding Level Out of <br />25 is <br />Energizing the <br />Chapel Hill- <br />Fleet Carrboro City $68,616 0 17.1 1 <br />Schools <br />Total Requested <br />by School <br />Districts(Funds <br />available for <br />68,616 0 <br />2021-22: <br />268,332.50) <br />1 Ranked Project— Energizing the Fleet <br />Applicant (Collaborators): Chapel Hill-Carrboro City Schools <br />Funding Requested: $68,616 <br />Recommended Funding Level: $0 <br />Total Score(Out of 25 pts): 17.1 <br />Project Description: "Procure three electric vehicles, each on a 36-month lease,with the intent to reduce <br />emissions created during normal school driving operation, instill greater awareness of alternative transportation <br />technologies during sustainability related events, and provide an educational tool for the district's automotive <br />and emergency response programs at Chapel Hill High School." <br />Level II charging infrastructure is limited to one site on CHCCS property.Typical charging will primarily occur <br />near the automotive yard at Chapel Hill High School utilizing 120V charging which could take up to eleven hours <br />at the maximum estimated usage in a given school day." <br />Benefits will become immediately realized through emissions reduction and continue for the 36 months each <br />vehicle is leased. Community engagement and education of students and staff members will take place within <br />the first six months of the acquisition of the electric vehicles with repeatable events on and off campus every <br />three to six months." <br />Project Benefits: "CHCCS currently does not own any electric vehicles with no timeline or designated funding for <br />their purchase or lease.This is an unrealized opportunity to reduce our carbon footprint, lower operating <br />DocuSign Envelope ID: FC54AC26-7897-4270-8EA1-D754CD59EA76
The URL can be used to link to this page
Your browser does not support the video tag.