Orange County NC Website
Warren Hay Mechanical <br />Contractors <br />Orange County EMS Dehumification Project <br />COR #1 <br />Change Order #1 <br />GFCI changes <br />Item Qty Unit Cost Sub Total Tax Total Material Costs Hrs.Costs 35% labor burden Total Labor <br />QOB225GFI Circuit Breaker 9 $359.64 $3,236.76 $242.76 $3,479.52 0 $0.00 $0.00 $0.00 <br />Std Circuit Breaker (per plan) -9 $74.08 ($666.72)($50.00)($716.72)0 $0.00 $0.00 $0.00 <br />GFCI Receptacle (per plan) -9 $25.00 ($225.00)($16.88)($241.88)0 $0.00 $0.00 $0.00 <br />Std Receptacle 9 $10.25 $92.25 $6.92 $99.17 0 $0.00 $0.00 $0.00 <br />PC 0 $0.00 $0.00 $0.00 $0.00 1 $78.00 $27.30 $105.30 <br />Totals $2,437.29 $182.80 $2,620.09 1 $78.00 $27.30 $105.30 <br />Total Labor & Material $2,725.39 <br />20% overhead & profit $545.08 <br />Total $3,270.46 <br />Bond $0.00 <br />Total Change order $3,270.46 <br />Labor Chart <br />Sheet Metal labor (SM) $55.00 <br />Controls / Electrical labor (CL) $61.00 <br />Pipe labor (PL) $65.00 <br />Project Coordinator (PC) $78.00 <br />Insulation labor (IL) $55.00 <br /> <br />DocuSign Envelope ID: 9F74B1B6-172C-4402-81E4-1025BB817A6D