Orange County NC Website
<br /> <br />Page 2 of 10 <br /> <br />has been reduced from 86 Heritage Lots to 84 Heritage Lots, due to lot configuration <br />and engineering feasibility corrections that were completed subsequent to the release of <br />the Historic Rogers Road Neighborhood Task Force Report; and <br /> <br />WHEREAS, representatives of the County and Towns have previously agreed in <br />principle that 65 of the 84 Heritage Lots in the Rogers Road Sewer Project Area had <br />existing dwellings located on the respective Heritage Lot parcels concurrent with the <br />release date of the Historic Rogers Road Neighborhood Task Force Report (based on <br />the evaluation of March 2013 aerial imagery), and have identified within Exhibit A herein <br />the 65 “Heritage Lots With Pre-Existing Dwellings”; and <br /> <br />WHEREAS, the 65 Heritage Lots in the Rogers Road Sewer Project Area with existing <br />dwelling units may have household income levels at or below 80% of the area median <br />income as defined by U.S. Department of Housing and Urban Development (HUD); and <br /> <br />WHEREAS, representatives of the County and Towns have previously agreed in <br />principle to jointly fund the installation of private sewer service lateral connections for <br />the 65 Heritage Lots with existing dwellings and with household income levels at or <br />below 80% of the area median income (LMI Heritage Lot Households) to the public <br />sewer system; and <br /> <br />WHEREAS, in 2022, representatives of the County and Towns have previously agreed <br />in principle that there are “Potentially Serviceable Lots” as defined within Exhibit A <br />herein that may have existing dwellings and may have household income levels or <br />below 80% of the area median income as defined by the U.S. Department of Housing <br />and Urban Development (HUD); and <br /> <br />WHEREAS, in 2022, representatives of the County and the Towns have previously <br />agreed in principle to jointly fund the installation of private sewer service lateral <br />connections for “Potentially Serviceable Lots” with existing dwellings and with <br />household income levels at or below 80% of the area median income (LMI Heritage Lot <br />Households) to the public sewer system; and <br /> <br />WHEREAS, as defined in the following schedule, the timeline for joint funding coverage <br />will begin after the execution of this Agreement by all Parties and upon the County’s <br />receipt of a valid dated application from the LMI Heritage Lot Household: Year 1 and <br />Year 2 (100% cost coverage); Year 3 (50% cost coverage); Year 4 and beyond (0% <br />cost coverage); and <br /> <br />WHEREAS, representatives of the County and Towns have previously agreed in <br />principle that the County will solicit competitive bids from licensed local plumbing <br />contractors, and will select the lowest responsive and responsible bidder for the <br />installation of private sewer service lateral connections for LMI Heritage Lot <br />Households; and <br /> <br />DocuSign Envelope ID: 6A765B18-7222-4240-AA94-EE24A3811D25